Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

Pexgol’s resistance to scaling and chemicals delivers consistent operation in open-pit mining.

Estudo de Caso Nº

176

Cliente

Buena Vista del Cobre
Mexico

|

2024

Condições de Trabalho

Temperature: Ambient (Design temp. 40°C) | Pressure: 160–180 psi | Flow Rate: 335 m³/hr | Fluid Composition: Molybdenite (MoS₂) in copper-molybdenum concentrate, with Mo, Cu, Fe, S, and Si

Solução Pexgol

Pexgol 8″ SDR 11

Aplicação

Molybdenum concentrate flotation

Comprimento

100 m / 328 ft

Categorias

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

The Challenge

At the Buena Vista del Cobre open-pit mine in Sonora, Mexico, molybdenum concentrate was transported through an HDPE pipeline. This system was regularly compromised by the highly scaling nature of the fluid, which consisted primarily of molybdenite (MoS₂) in a copper-molybdenum concentrate containing Mo, Cu, Fe, S, and Si.

The HDPE pipelines required daily manual intervention to prevent blockages, including frequent hammering along the line to maintain flow. Additionally, sections of the pipe had to be replaced at least once a month due to severe scaling buildup—resulting in high maintenance costs, operational delays, and recurring shutdowns.

The Solution

In 2024, the mine replaced 100 meters of 8” SDR 11 HDPE pipe with Pexgol pipe for its molybdenum concentrate flotation line. Pexgol was selected for its exceptional chemical and corrosion resistance, and especially its superior performance against scaling—a crucial feature given the aggressive nature of the transported slurry and the system’s operating conditions (160–180 psi pressure and temperatures up to 40°C).

The installation was fast and simple, requiring no specialized equipment. The Pexgol coil was unrolled using an excavator and front loader, and the pipe was laid in place within hours. Only electrofusion couplings (EF) were used, further simplifying the process.

Results

After one year of continuous operation, the client reported zero blockages and no maintenance required on the Pexgol line. This has eliminated the need for frequent replacements and cleaning, drastically reducing operational costs and ensuring uninterrupted flotation processes that meet Grupo México’s high efficiency standards.

Estudos de Caso Relacionados

Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Dewatering without Supports

Open Cast Mine Dewatering

El Volcan Mine Arcelor Mittal
Mexico

 | 

2017
Vertical Mobile Pexgol Installation on the Rocks for Mine Dewatering.

Mine Dewatering at Low Temperature

Ferrexpo Yeristovo Mining
Ukraine

 | 

2019
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019