Operational Test Parameters

Flow Rate: 700 tons per hour
Installed Pipe: Pexgol 500 mm – SDR 11
Wall Thickness: 45,4 mm
Replaced Pipeline: Steel pipe with polyurethane lining
Steel Thickness: 3/16” (4,95 mm)
Polyurethane lining thickness: 1/2”
Polyurethane properties: Tensile strength: 5800 PSI | Tear resistance: 480 PSI | Hardness: 85 Shore
Maximum Operating Pressure: 150 PSI
Operating Temperature: 33 °C
Slurry Composition: Iron ore slurry with 48–60% iron and silica content in water
Particle Size: D80 = 150 microns

Test Timeline

Start of Test: December 15, 2022
First Inspection: May 3, 2023
Second Inspection: December 2, 2025

The Challenge

The Cauê Mine, operated by Vale in Brazil, has a tailings transport pipeline several kilometers long with a diameter of 18 inches. The existing pipeline is constructed from carbon steel internally lined with polyurethane (PU).

Due to the highly abrasive nature of the iron ore slurry, the pipeline requires frequent and costly maintenance. This includes periodic replacement of full pipe sections or refurbishment of the internal polyurethane lining.

Given the significant capital investment required to replace the entire pipeline, Vale decided to first conduct a field performance test using Pexgol crosslinked polyethylene (PE-Xa) pipes. The objective was to evaluate the pipe’s resistance to abrasion and its operational performance under real operating conditions.

The test installation was performed in the Grinding Area (Milling Plant) of the Cauê Mine.

Test Objective

The objective of the test was to perform Non-Destructive Testing (NDT) on a 3,000 mm long Pexgol pipe section installed in the discharge pipeline of pumps BP-1920EE-05/06, responsible for feeding tank CX-1491EE-09. The installation took place on December 15, 2022, and the evaluation aimed to verify the pipe’s structural integrity and wear performance during operation. Additionally, the test provided technical support to the Cauê Mine engineering team in their evaluation process for potential pipeline replacement decisions.

Inspection and Testing Methodology

During the monitoring period, the following inspections and tests were performed:

  • Visual Inspection (VI)
  • Ultrasonic Thickness Measurement (UT)
    These tests were conducted in the Grinding Plant area of the Cauê Mine to identify any operational deviations or anomalies during pipeline service. The inspections focused on detecting:
  • Premature wall thickness reduction
  • Material deformation
  • Operational anomalies that could compromise the pipeline integrity All inspections were conducted in accordance with SAT-3833 standard procedures and applicable technical reference documents.

Wear Rate Results

Average wear rate measured during inspections:

  • Point 01: 0.6 – 1.0 mm/year
  • Point 02: 0.9 – 1.3 mm/year
  • Point 03: 0.8 – 1.2 mm/year
  • Point 04: 0.4 – 0.8 mm/year

 

Conclusions

The field test was considered successful, as the wear rate measured in the Pexgol pipe was lower than the expected wear behavior of the previously installed steel pipe with polyurethane lining, when considering the available wall thickness and operational conditions. No leaks, structural failures, or operational anomalies were observed during the testing period. Considering that the installed pipe is Pexgol SDR 11, capable of operating at 220 PSI, and accounting for an allowable 40% wall thickness wear, the estimated service life of the pipe under these operating conditions is approximately: 12 years. This result demonstrates the excellent abrasion resistance and operational reliability of Pexgol pipes for highly abrasive slurry transport applications in mining operations.

Related Case Studies

Осушение сквозных шахтных стволов на подземном свинцово-цинковом руднике.

Осушение сквозных шахтных стволов

Esan Eczacibasi Endustriyel Hammaddeler
Турция

 | 

2019
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Монтаж труб Pexgol для дренажа в подземном руднике.

Высоконапорный дренаж в подземном руднике

Рудник Охос-дель-Саладо — Lundin Mining
Чили

 | 

2018
Pexgol’s resistance to scaling and chemicals delivers consistent operation in open-pit mining.

Switch to Pexgol Reduces Downtime in Molybdenum Concentrate Transport

Buena Vista del Cobre
Mexico

 | 

2024
Record-time intervention that avoided operational losses in a dehydration plant.

Critical Pipeline Replacement in Dehydration Plant with Operational Continuity

Petróleos Sudamericanos
Argentina

 | 

2025
Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024