Transport of Hot Air for Advanced Agriculture

Replacement Of PVC Piping for PE-X in a Industrial Heating System.

Case Study Nº

113

Customer

Teva Post
Israel

|

2022

Working Conditions

Pressure: 2.5-3.5 bar | Temperature: 50° to 70°C / 122° to 158°F

Pexgol Pipes

Pexgol 160 mm (6”), class 15 | Pexgol 75 mm (2”), class 15

Application

Industrial heating system

Lenght

500 m / 1640 ft

Categories

The Challenge

Teva Post factory is the exclusive producer of the champignon mushrooms under the brand “Marina Peyrot HaGalil” in Israel.
The mushrooms at Teva Post are grown and cured at closed growing rooms in plastic trays on self-made “compost” substrate and under very controlled and precise lighting, humidity and temperature conditions.

The cooling to the breeding rooms is carried out by a central heating system that feeds industrial air conditioning units (evaporators and blowers) that convert the temperature from hot to cold by condensing the hot water (50° to 70° C) and push cooled air into the cells in use without the need for gas compression, similar to conventional air conditioners.

The hot water is flowed to the cooling/conditioning units in a closed circulation piping (2.5 to 3.5 bar) system and energy activity in the whole system is controlled by thermal sensors inside the mushroom growing rooms.

The original hot water transmission system was installed in PVC piping that twisted and collapsed completely when, as a result of a sensor error, the temperature in the system momentarily climbed to 90°C.

Pexgol Solution

After the original PVC pipes collapsed, the client decided to install in the main transmission lines with Pexgol 160 mm, class 15 and in the supply pipes to the cooling units, Pexgol 75 mm, class 15 due to the piping ability to be used at high temperatures up to 110°C.

The installation was easily done using Reinforced EF Couplers Series 1 connectors.

Related Case Studies

Dalvian SA Implements Pexgol for Potable Water Pipeline in the Mountains.

Innovative Solution for Water Supply in Extreme Terrain

Dalvian
Argentina

 | 

2024
EMESA Optimizes Formation Water Transportation in Mendoza.

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA
Argentina

 | 

2023
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023
Добыча подземной воды из скважин

Добыча подземных вод

Компания Doña Inés de Collahuasi SCM, шахта Collahuasi
Чили

 | 

2010
Replacement of a Drainage Line in an Underground Mine.

Дренаж в подземном руднике

Atacama Kozan
Чили

 | 

2019