Transport of Muddy Water for Palm Oil Extractor

Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Case Study Nº

121

Customer

Extractora Poligrow
Colombia

|

2022

Working Conditions

Flow rate: 176 PSI | Temperature: 80°C / 176°F

Pexgol Pipes

Pexgol 110 mm (4″), Class 15

Application

Transport of Muddy Water

Lenght

550 m / 1084 ft

Categories

Transport of Muddy Water for Palm Oil Extractor

The Challenge

Poligrow Colombia is a company dedicated to the development of agro-industrial projects, focused on palm oil extraction.

Poligrow needed a new transport line for muddy water to the oxidation lagoons. For this purpose, excavation and installation of the piping was carried out in the palm crop, without causing damage to the plants or irrigation piping. The route of the piping extended from Florentino, passing through the main road and the plantation

Pexgol Solution

Poligrow opted to use Pexgol’s PE-X piping for the transport of muddy water. The choice of Pexgol was crucial to finish the project quickly and efficiently.

Pexgol was chosen for several reasons: firstly, the installation was quick and simple, which saved time and costs. Additionally, the use of PE-X piping reduced the number of necessary joints, further simplifying the installation.

Another advantage was the supply in a 550-meter roll, which minimized the need for additional cuts and joints. The installation of the 550 meters of piping was carried out in a record time of 7 hours, thanks to the efficiency and simplicity of the process.

To carry out the installation, two GP mechanical joints were used, and support was provided by a CAT 312 backhoe, a Benitin vibrocompactor, and a ratchet. In addition, the technical team responsible for the installation consisted of one officer and one assistant.

In summary, the choice of Pexgol and its PE-X piping for the transport of muddy water in the palm oil processing plant was a wise decision, as it allowed the project to be completed quickly, efficiently, and with minimal interruptions.

Related Case Studies

Замена трубы ПЭНД на трубу компании Pexgol

Транспортировка сжатого воздуха

Шахта компании Saucito S.A. de C.V.
Мексика

 | 

2017
Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Fiber Optic Cables Through a Vertical Shaft

Sinohydro
Israel

 | 

2021
Монтаж труб Pexgol для транспортировки пластовой воды (с газом и минералами)

Газовые скважины: обработка пластовой воды

Canacol
Колумбия

 | 

2018
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Safety and durability: The heart of our solutions

Minera Fresnillo
Mexico

 | 

2021
Фитинги Pexgol для транспортировки рассола в бразильской химической компании.

Высокая коррозионная стойкость к рассолу

Unipar Carbocloro
Бразилия

 | 

2019