Mineral Processing – Brine Transportation

Reduction of material build-up in brine and brine/acid lines

Case Study Nº

8

Customer

SQM,Pedro Valvidia Mine
Chile

|

2010

Working Conditions

Ambient temperature -5°C to 0°C (32°F to 23°F). High level of material build-up and corrosion inside the pipe. Working pressure: 15 bar.

Pexgol Pipes

Pexgol and elbows 160×14.6, Class 15.

Application

Brine and acid transportation.

Lenght

12 meters.

Categories

Mineral Processing - Brine Transportation

The Challenge

As the brine water and acid solution was being transported by the initial HDPE pipeline, salts were sticking to the pipe walls, reducing the inner diameter. Due to the low ambient temperatures, deposits of calcium sulfate formed on the inner wall of the pipes and on the elbows.

The matter was critical since the problem forced complete halting of work at the plant as well as lot of maintenance and reduction of production capacity.

Pexgol Solution

SQM decided to replace its HDPE pipes and elbows with Pexgol’s. Due to the especially smooth internal surface of Pexgol’s pipes and elbows, the replacement of HDPE pipes with Pexgol eliminated the problem of chemical deposits. This resulted in fewer work interruptions and improved production capacity.

The production and transportation of Pexgol’s pipes in coils also reduces the number of joints and possibility of clogging. As a result, it reduced maintenance costs and brought the end of frequent forced halts in the work processes at the plant.

The original mean time between failures (MTBF) of the HDPE pipes was one month. Since changing to Pexgol in 2010, no sign of failure has been detected.

Related Case Studies

Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Optimization of Water Systems in the Energy Industry.

“Threading” Pexgol Pipes

Pluspetrol
Argentina

 | 

2023
Coarse NACL (SALT) Dredging Tailing

Slurry Lines – Abrasive Dredged Material

ICL group, Dead Sea Works
Israel

 | 

1992