Water Transport in Copper Mine

Work with High Pressures and Extreme Ambient Temperature

Case Study Nº

68

Customer

Zaldivar SPA Mine
Chile

|

2018

Working Conditions

Pressure: 24 & 30 bar | Ambient temperature: 5° to 28°C / 41° to 82°F

Pexgol Pipes

Pexgol 160 mm (6”), Class 15 | Pexgol 160 mm (6”), Class 19 | Pexgol 160 mm (6”), Class 24 | Pexgol 160 mm (6”), Class 30

Application

Water transport

Lenght

9500 m

Categories

Work with High Pressures and Extreme Ambient Temperature

The Challenge

The mining company Zaldivar SPA (Barrick) needed to implement a line of drinking water from the storage pond to the camp sector, crossing the entire mining site. Two thirds of the layout required a pressure of 24 and 30 bar, using the minimum amount of joints possible and in the shortest time conceivable.

Pexgol Solution

It was decided to install 9500 m of Pexgol pipe due to its advantages:

  • High pressure resistance (24 and 30 bar)
  • Supply in long lengths (sections of up to 600 meters) minimizing assembly time and number of joints.
  • Resistance to mechanical stresses due to pipe dragging in hard to reach areas.

The installation was simple, fast and safe. Without resources or special tools, shortening the known assembly program with HDPE pipes.

Related Case Studies

Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995
Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018
An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Water Supply & Fire Extinguisher Line

Cheddi Jagan International Airport
Guyana

 | 

2018
Installation of Pexgol Pipes for a Compress Air System.

Compressed Air System

Rav-Gon Printing House
Israel

 | 

2020
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020