Skip to content

Hot Water Supply

Installation of Pexgol Pipes for Transporting Hot Water.

Case Study Nº

92

Customer

Hilton
Israel

|

2020

Working Conditions

Temperature: 70°C – 85°C | Pressure: 6 bar

Pexgol Pipes

Pexgol 16 mm – 32 mm class 24

Application

Hot Water Transportation

Lenght

Categories

Installation of Pexgol Pipes for Transporting Hot Water.

The Challenge

As one of the largest, and most well-known hotels, the “Hilton” hotel, located in central Israel, is obligated to supply hot water completely free of corrosion-residuals. While historically metal pipes were used for high-rise buildings, metal piping systems tend to cause severe corrosion accumulation. Corrosion build up could lead to damaged pipes and malfunctioning valves, connectors, pumps etc.

Pexgol Solution

The client decided to install Pexgol piping system to bring in a perfect non-corrosion-over-time solution. Pexgol cross-linked polyethylene can withstand high-temperature and high-pressure environments and provide a reliable and stable solution.

Related Case Studies

Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Pexgol’s Piping Solution for Regal Petroleum.

Overcoming Piping Challenges in Hydrocarbon Transportation

Regal Petroleum Corporation
Ukraine

 | 

2023
Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987
Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018