Hot Water Supply

Installation of Pexgol Pipes for Transporting Hot Water.

Estudo de Caso Nº

92

Cliente

Hilton
Israel

|

2020

Condições de Trabalho

Temperature: 70°C – 85°C | Pressure: 6 bar

Solução Pexgol

Pexgol 16 mm – 32 mm class 24

Aplicação

Hot Water Transportation

Comprimento

Categorias

Installation of Pexgol Pipes for Transporting Hot Water.

The Challenge

As one of the largest, and most well-known hotels, the “Hilton” hotel, located in central Israel, is obligated to supply hot water completely free of corrosion-residuals. While historically metal pipes were used for high-rise buildings, metal piping systems tend to cause severe corrosion accumulation. Corrosion build up could lead to damaged pipes and malfunctioning valves, connectors, pumps etc.

Pexgol Solution

The client decided to install Pexgol piping system to bring in a perfect non-corrosion-over-time solution. Pexgol cross-linked polyethylene can withstand high-temperature and high-pressure environments and provide a reliable and stable solution.

Estudos de Caso Relacionados

Acid liquor line with high levels of abrasion and sedimentation

Abrasive Liquid Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2014
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Transport of Muddy Water (Pome) witha High Content of Organic Load.

Transport of Muddy Water in a Palm Oil Processing Plant

La Gloria
Colombia

 | 

2020
Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017