Alumina Plant: Ore Slurry Transportation
Transportation of Bauxite Ore Slurry at 95°C / 203°F
Case Study Nº
52
Customer
Urals Alumina Plant – Rusal
Russia
|
2013
Working Conditions
High temperature
Pexgol Pipes
Pexgol 160 mm Class 15
Application
Slurry Transportation
Lenght
20 m
Categories

The Challenge
At Urals Alumina Plant, they required to renovate their carbon steel pipes where they transport bauxite ore slurry at 95°C / 203°F. Every year these lines were suffering from sedimentation problems and it was necessary to clean them every three months, involving man power and high costs.
Pexgol Solution
The client decided to replace the carbon steel pipes with Pexgol pipes. Thanks to it smooth inner surface, sedimentation is not a problem and as a consequence requires less maintenance, lowering also costs.
The Pexgol pipes have been checked annually and even after 4,5 years of exploitation, the pipes have shown positive results. They don’t have to clean the pipes any more.
Related Case Studies
Fewer Shutdowns, Greater Efficiency: Pexgol in the Salt Industry
Sales del Istmo
Mexico
|
2023
Fast and Reliable Solution for Winemaking Processes
Zuccardi Winery
Argentina
|
2024
Scaling Up Efficiency: District Energy at Penn State Harrisburg
Penn State University - Harrisburg
USA
|
2021
Drainage Lines in Underground Mine
Lundin Mining – Candelaria Norte Mine
Chile
|
2020