The Challenge
At Urals Alumina Plant, they required to renovate their carbon steel pipes where they transport bauxite ore slurry at 95°C / 203°F. Every year these lines were suffering from sedimentation problems and it was necessary to clean them every three months, involving man power and high costs.
Pexgol Solution
The client decided to replace the carbon steel pipes with Pexgol pipes. Thanks to it smooth inner surface, sedimentation is not a problem and as a consequence requires less maintenance, lowering also costs.
The Pexgol pipes have been checked annually and even after 4,5 years of exploitation, the pipes have shown positive results. They don’t have to clean the pipes any more.
Estudos de Caso Relacionados
Open Cast Mine Dewatering
Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile
|
2013
Overcoming Piping Challenges in Hydrocarbon Transportation
Regal Petroleum Corporation
Ukraine
|
2023
Efficient and Safe Irrigation in Secondary Leaching with Pexgol
Minas Argentinas S.A.
Argentina
|
2025
Fast and Reliable Solution for Winemaking Processes
Zuccardi Winery
Argentina
|
2024