Skip to content

Compressed Air Transportation

Replacement of a HDPE Pipe for a Pexgol Pipe

Case Study Nº

41

Customer

Saucito S.A. de C.V. Mine
Mexico

|

2017

Working Conditions

Pressure 205-262 psi; Temperature 60°C to 71°C / 140° F to 159.8°F.

Pexgol Pipes

Pexgol SDR 6 110×18.3.

Application

Compressed air transportation.

Lenght

600 meters.

Categories

Replacement of a HDPE Pipe for a Pexgol Pipe

The Challenge

The client decided to replace their current HDPE pipe lines which transported compressed air at 60°C to 71°C / 140° F to 159.8°F.

The reason for replacing the HDPE pipes was serious leaks on the thermo-fusion joints.

As one possible reason for these failures, the client pointed out that the maximum allowed temperature of the HDPE pipes was just up to 45°C / 113°F.

Pexgol Solution

In order to solve this problem, Saucito Mine decided to replace their HDPE pipes for Pexgol pipes.

Beside their high temperatures resistance up to 110°C / 230°F, Pexgol pipes are not connected by thermo-fusion joints. They are supplied in 600 meters long sections with very few connections.

The installation was fast and efficient and no sophisticated tools were necessary.

Related Case Studies

Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021