Skip to content

High Corrosion Resistance Against Brine

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

Case Study Nº

89

Customer

Unipar Carbocloro
Brazil

|

2019

Working Conditions

Composition: 74,8% NaCl; 0,077% NaOH; 0,002% Na2CO3; 0,853% Na2SO4; 24,33% H2O | Temperature: 77°C / 170.6°F | Flow: 69 m³/h | Pump pressure: 8 kgf/cm²

Pexgol Pipes

Pexgol 125 mm (4”), Class 15

Application

Brine

Lenght

Prefabricated Elbows and Short Sections

Categories

Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

The Challenge

Unipar Carbocloro is a Brazilian chemical company that operates in the soda and chlorine industry. At the outputs of the brine pumps, Carbocloro used to replace its piping components at least once every 6 months. They tried several materials and not one had performed successfully. The last ones were made of nickel and yet did not last more than six months, having leakages all around. The high corrosivity of the media was the main issue to be faced.

Pexgol Solution

Pexgol’s engineering team analyzed the whole situation, suggested a new design using Pexgol pipes and accessories and nowadays the output of the pump has worked non-stop (and with no signs of probable stops) for 9 months already.

The installation, despite the solution being formed by several parts, was easy and quick. Carbocloro’s team simply based the tasks on the plans providaded by the factory.

Related Case Studies

Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
 How Pexgol streamlined water transportation at Zuccardi Winery

Fast and Reliable Solution for Winemaking Processes

Zuccardi Winery
Argentina

 | 

2024
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019