Recovered Water Transportation
Grey Water Transportation
Case Study Nº
38
Customer
Coeur Mexicana S.A. de C.V. Palmarejo
Mexico
|
2017
Working Conditions
74 psi, altitude dierence= 34 m, Au= 0.12 ppm, Ag= 0.18 ppm, Cu= 1.13 ppm, Fe= 0.73 ppm, Cn total= 1.5 ppm, Ca= 458 mg/dL, Ph= 8
Pexgol Pipes
Pexgol SDR 15 225 x 20.4.
Application
Water transportation.
Lenght
1200 meters.
Categories

The Challenge
Coeur Mexicana required to transport recovered water, but they wanted to conduct an installation in the minimum time possible that won’t require contractors, specialized personnel neither expensive equipment.
Pexgol Solution
The client decided to install Pexgol, due to it quick and easy installation, that if was carried out with steel or HDPE pipes, it would require 100 joints. But, since it was done with Pexgol pipes it only took 4 joints.
Furthermore, it was considered the security that Pexgol pipes offer, since it’s supplied in long length coils, which reduces leakages.
Pexgol’s team advised the client during the whole process from the design to the installation.
Related Case Studies
Mine Dewatering at Low Temperature
Ferrexpo Yeristovo Mining
Ukraine
|
2019
Success in Agricultural Desalination: Water Supply Challenges
BerryMex
Mexico
|
2019
Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport
Syncrude
Canada
|
2022
Transport of Compressed Air for Underground Mine
HMC Gold
Chile
|
2021