Skip to content

“Threading” Pexgol Pipes

Optimization of Water Systems in the Energy Industry.

Case Study Nº

160

Customer

Pluspetrol
Argentina

|

2023

Working Conditions

Temperature: 20°C / 68°F | Pressure: 10 kg/cm²

Pexgol Pipes

Pexgol 160 mm, class 15

Application

Aqueduct

Lenght

850 m / 2788 ft

Categories

“Threading” Pexgol Pipes

The Challenge

Pluspetrol, an international company with extensive experience in oil and gas exploration and production, faced a significant problem with one of its water pipelines in Argentina. The existing carbon steel pipe, used to transport fresh water, showed evident signs of wear due to corrosion and blockages caused by scaling, compromising the efficiency and safety of the water distribution system.

The Solution

To address these issues, Pluspetrol decided to replace the existing pipe with 160 mm, class 15 Pexgol pipe, extending over 850 meters. Pexgol was chosen due to its high resistance to corrosion and its ability to resist scaling, in addition to its lightness and ease of handling, which allow for quick transport and installation.

The installation of the new pipe was carried out over a period of two weeks. During this time, a specialized procedure was developed to integrate the Pexgol pipe within the existing steel structure every 220 meters. A specific tool was
designed to advance and dismantle blockages caused by scaling, working in coordination with the municipality to ensure compliance with all necessary permits.

The implementation of the Pexgol piping system in Pluspetrol’s aqueduct offered multiple benefits. The rapid installation and flexibility of the material allowed for efficient integration without significantly disrupting daily
operations. Pexgol pipe, known for its durability and corrosion resistance, promises a long lifespan and a notable reduction in maintenance costs.

Additionally, the use of connections such as the double mechanical connector and flanged coupling ensured a safe and effective installation, adapted to the technical demands of the project.

Related Case Studies

Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023
Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022