Skip to content

Potable Water Aqueduct

Transport of Drinking Water in Harsh Terrain.

Case Study Nº

80

Customer

Acueducto y Alcantarillado de Bogotá
Colombia

|

2019

Working Conditions

Pressure: 15 bar | Temperature: Ambient

Pexgol Pipes

Pexgol 110 mm (4”), class 15

Application

Potable Water Transport

Lenght

200 m / 656 ft

Categories

Transport of Drinking Water in Harsh Terrain.

The Challenge

The Bogotá Aqueduct and Sewer Company (Acueducto y Alcantarillado de Bogotá) needed to provide potable water to the Aguas Claras area (Colombia). This community is located on place that is very difficult to access due to the topography of the place. The pipe to be installed had to go through a mountainous and vegetated area.

Pexgol Solution

The client chose Pexgol due to its advantages, and theyt also wanted to carry out this installation as a test to compare the performance of the PE-X versus the HDPE that they regularly used.

The installation was carried out by deploying the pipe on the field, with no sand bed or need to be buried, being placed and dragged directly on the ground in just 4 hours.

After 180 days of successful operation, the Aqueduct and Sewerage System in Bogotá certified the good behavior of the installed pipeline and justified its use for the following reasons:

  • A 10-year guarantee was granted (for the transport of drinking water).
  • The pipes are designed for a lifespan of more than 50 years.
  • Easy manipulation in the field, which means fewer operators.
  • Minimize the use of accessories reducing costs, head losses, labor and installation time.
  • Due to its compatibility for connection with other pipes: HDPE, carbon steel, among others.

Related Case Studies

Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Dewatering without Supports

Open Cast Mine Dewatering

El Volcan Mine Arcelor Mittal
Mexico

 | 

2017
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022