Skip to content

Process Plant: Transport of Leached Slurry

Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Case Study Nº

62

Customer

Barrick Gold – Pueblo Viejo
Dominican Republic

|

2018

Working Conditions

Acid solution at 100°C. Chemical Composition: SiO2 64%; Al203 11.25%; As 0.05%; Ca 0.17%; Cr 0.01%; Cu 0.03%; Fe 5.37%; K 0.04%; Mg 0.02%; Na 0.08%; Pb 0.04%; Zn 0.17%

Pexgol Pipes

Pexgol 63 mm (2”), Class 15

Application

Slurry transportation

Lenght

2 m / 6.5 ft flanged sections 45° & 90° prefabricated elbows 100 m / 328 ft coils

Categories

Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

The Challenge

Barrick Gold at the Pueblo Viejo mine was transporting slurry (acid solution) through titanium pipes GR2, SCH80S 2 for the drainage of the autoclaves, using this material due to the combination of low pH and abrasion in the fluid.

When using titanium, the tubes and elbows needed to be replaced on average between 3 and 6 months due to wear.

Pexgol Solution

The team of Pexgol together with the engineers of the Process Plant decided to carry out a test to replace a 2 meter (6.5 ft) section of their titanium pipe.

The first Pexgol pipe was installed at the end of the year 2017. This pipe section is still in operation, surpassing on a large scale the service life with the pipeline used previously.

Given the success of the test, almoust the rest of the line has been replaced, including 45° and 90° prefabricated elbows, thus avoiding plant stoppages and unnecessary losses.

Due to the difference in temperature at the time of installation and the operating conditions, part of the installed tubes suffered the “snake” effect. Due to aesthetic and operational issues, this problem was solved by installing additional support, leaving the tubes straight and firm.
Pexgol pipes resistance to temperature and abrasion combined with the smooth internal surface made the installation a success.

Related Case Studies

Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
Installation of Pexgol Pipes for a Compress Air System.

Compressed Air System

Rav-Gon Printing House
Israel

 | 

2020
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022