Skip to content

Mineral Processing Corrosive Liquid & Vapor

Transportation of mixed liquid and corrosive vapor (H2S) from the dehumidifiers

Case Study Nº

11

Customer

Moa Nickel S.A. Sherritt
Cuba

|

2011

Working Conditions

High corrosive liquid operating at 95°C/203°F.

Pexgol Pipes

Pexgol 280 mm Class 10.

Application

Dehumidifier water line.

Lenght

800 meters.

Categories

Mineral Processing Corrosive Liquid & Vapor

The Challenge

Cuba’s nickel reserves are among the largest in the world largest exports, making it essential to provide reliable and durable pipelines for the transportation of its minerals. Unfortunately, the high percentage of hydrogen sulfide in the hot water from the dehumidifiers over an extended period of time lends itself to high levels of corrosion and functional deterioration. Problems occurred from the beginning in previous installations, forcing work halts.

Before turning to Pexgol, our client tried an alternative piping solution without success: Carbon steel rubber lined (CSRL) – which proved to be damaged by weather conditions as well as suffer from extensive problems of corrosion around the welds due to lack of rubber. Such high levels of corrosion can also lead to a potential reduction of hydraulic capacity.

Pexgol Solution

A Pexgol 280 mm class 10 pipe with electrofusion couplers surrounded by steel reinforcements was installed, enabling durability under very high temperatures.

Several months since the installation of Pexgol, the system operates without any problems, it resulted more cost-effective per meter and had lower installation costs. As a result of the new installation, the line hydraulic capacity increased beyond the maximum expected values by the operations managers.

Related Case Studies

Field evaluation of Pexgol PE-Xa pipes under highly abrasive iron ore slurry conditions at Cauê Mine.

Test Case – Field Performance Evaluation of Pexgol

Vale
Brazil

 | 

2025
Pexgol: Delivering Rapid, Reliable & Long-lasting Mining Drainage Solutions

Addressing Drainage Challenges with Pexgol

Avino Mine
Mexico

 | 

2023
Test Of Pexgol Pipes Vs Hdpe Pipes For Brine Transportation

Test: Pexgol vs HDPE for Brine Transportation

YBL
Bolivia

 | 

2017
Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Installation of a Pexgol Line for the Transport of Formation Water in an Oil Company.

Replacement of Metal Pipe with PE-X for Formation Water

Enap Sipetrol Ecuador
Ecuador

 | 

2022
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015