Transport of Compressed Air

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Case Study Nº

66

Customer

Meridian Mine – Faena El Peñón
Chile

|

2018

Working Conditions

Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 15

Application

Transport of compressed air

Lenght

1800 m

Categories

Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

The Challenge

The Meridian Mine (Faena El Peñón) required the installation of a line for the transport of compressed air from the surface (horizontal), crossing roads of mining vehicles, ending 200 meters deep inside an underground mine through a vertical chimney.
The line had to withstand 10 bar of pressure.

Pexgol Solution

The client decided to install a 160 mm (6”) Pexgol pipe class 15 SDR 11 of 1800 meters in coils of 600 meters each.
Pexgol pipe was selected due to it advantages:

  • Less joints were needed, contributing to saving costs and giving more reliability to the line.
  • Resistance to mechanical stresses involved in installing at mining crossroads, using a 1.5 meter ditch and filling with material from the same ditch, without using a steel jacket.
  • Resistance to changes in ambient temperature (5°C to 30°C).
  • Creep resistance.

The installation was simple: only 4 mechanical connections were used, selected by the mining company without using special tools. If HDPE pipes were used, about 150 mechanical connections would have been required.

Also, to support the Pexgol pipes in the upper zone, before entering the underground mine by the chimney, a mechanical system designed by the mining company was incorporated.

Related Case Studies

Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016
Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018
Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Transportation of Water with Solids

Kofanor
Mexico

 | 

2022
Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015