Transport of Silica Arena: HDPE vs Pexgol

Test Installation for Transporting Silica Sand.

Case Study Nº

90

Customer

Covia Corp
Mexico

|

2019

Working Conditions

Pneumatic transport at 6 bar

Pexgol Pipes

Pexgol Elbow 90° 225 mm (8”), Class 15 | Pexgol Flange Coupler 225 mm (8”)

Application

Transport of Silica Arena

Lenght

Categories

Test Installation for Transporting Silica Sand.

The Challenge

Covia Corp, a leading company in the manufacture and sale of industrial minerals in Mexico, required to pneumatic transport silica sand at 6 bar (with 50% solids). Initially they worked with 225mm (8”) HDPE pipes that suffered from high levels of wear at the elbows due to abrasion of the material it was carrying.

Pexgol Solution

The client decided to replace one of the HDPE elbows with a Pexgol 90° 225 mm (8”) class 15 and test it for 3 months.
HDPE elbows generally lasted up to a month and a half of work. The Pexgol elbow had to at least double the operating time to pass the test.

After 3 months of testing it was shown that Pexgol exceeded expectations. It’s been more than a year and the elbows continue to function without problems.

Only torque wrenches were used for the installation.

Related Case Studies

Water line feed from wells to mine

Water Lines – High Pressure Water Feed Lines

Yamana Gold, Meridian Mine
Chile

 | 

2012
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Installation Of Pexgol Hanging Pipes In Underground Mine

Underground Mine Dewatering

Codelco Chuquicamata
Chile

 | 

2017
Securing the future of gold mining: Newmont Corporation chooses Pexgol for water transport

Newmont’s Water Transportation Revolution with Pexgol Pipes

Newmont Corporation
Argentina

 | 

2018
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013