Water Drainage at an Underground Mine
Water Drainage From the Inside of an Underground Mine
Case Study Nº
31
Customer
El Peñón Yamana Gold, Meridian Mine
Chile
|
2016
Working Conditions
Extreme temperatures (-5° to 38°C).
Pexgol Pipes
Pexgol 160 mm Class 15 (SDR 11).
Application
Water drainage.
Lenght
600 m.
Categories

The Challenge
The water drainage from the inside of Meridian underground mine was processed through an HDPE 12 meter pipe that required 50 joints to be installed. The total installation time was 4 days, with no chance to minimize costs. Furthermore, the pump operated over it efficiency levels.
Pexgol Solution
A 600 meters Pexgol pipe 160 mm Class 15 was provided, in one section without joints. The Pexgol pipe was carried for 6 kilometers in 2 turns, which caused as a result 50% of time saved in the installation.
Due to the lower load losses, now the pump operates at its mayor efficiency level.
Related Case Studies
Potable Water Supply on Harsh Terrain
Mekorot / Beit Shemesh Water Company
Israel
|
2017
Drainage in Underground Mine
Atacama Kozan
Chile
|
2019
Open Cast Mine Dewatering
El Volcan Mine Arcelor Mittal
Mexico
|
2017
Mine Dewatering at Low Temperature
Ferrexpo Yeristovo Mining
Ukraine
|
2019
Fiber Optic Cables Through a Vertical Shaft
Sinohydro
Israel
|
2021