Skip to content

Pulp & Paper Mill

Hot Caustic Line Replacement in Paper Mill

Case Study Nº

51

Customer

Svetlogorskiy Mill
Russia

|

2015

Working Conditions

Non-pressure, high temperature and scrubber water

Pexgol Pipes

Pexgol 160 mm Class 15

Application

Alkali transportation in caustic and regeneration workshop

Lenght

13 m

Categories

Hot Caustic Line Replacement In Paper Mill

The Challenge

At Svetlogorskiy Mill Paper Plant they needed to repair their stainless steel pipes a few times a year, since they were transporting alkali at very high temperature.
The main challenge for the line was the sedimentation issues.

Pexgol Solution

The client decided to replace the stainless steel pipes with Pexgol pipes. Thanks to it smooth inner surface, sedimentation is not a problem and as a consequence requires less maintenance.
The line has been installed since 2015 and it stills shows amazing results.

Related Case Studies

Water Transport from a Borehole with Low Ph.

Water transport in textile factory

CMT La Laguna
Mexico

 | 

2018
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Water Drainage From the Inside of an Underground Mine

Water Drainage at an Underground Mine

El Peñón Yamana Gold, Meridian Mine
Chile

 | 

2016
Transforming water transportation with Pexgol technology

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Comisión Federal de Electricidad
Mexico

 | 

2023
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024