Transport of Lime Slurry

Transport Of Lime Slurry At 100°C

Case Study Nº

28

Customer

Minas de Oro Nacional, Mulatos Mine
Mexico

|

2015

Working Conditions

Extreme transportation temperature (100°C).

Pexgol Pipes

Pexgol 90 mm (SDR 7.4).

Application

Lime slurry transportation.

Lenght

150 m.

Categories

Transport Of Lime Slurry At 100°C

The Challenge

The client needed to transport lime slurry, which is highly fouling due to the high temperatures and the liquid consistency. The lime slurry was transported at 100°C, damaging all metals and plastics that were not resistant enough. The fouling caused a considerable diminution on the inside diameter of the former pipe, sometimes even closing it completely. Previously the client used to work with a rubber hose, but due to the extreme conditions, and the lack of a flat inside surface, it wasn’t enough to prevent the accumulation.

Pexgol Solution

Golan provided 50 meters of Pexgol 90 mm pipe (3” – SDR 7.4). The installation was easy due to the one section pipe, that didn’t require joints. The natural curve radio was utilized to pass all the obstacles during the installation. Pexgol pipes proved to be the best solution, thanks to it’s high resistant to abrasion, corrosion, encrustation and resistance to high temperatures.

The client saved costs; formerly the rubber hose cost 6 times more than Pexgol. In the other hand, the MTBF was just two month.

Since the Pexgol pipe installation no maintenance has been required, not even plant stops.

Related Case Studies

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015
Mining Effluent Transportation in Cuba.

Pexgol Optimizes Tailings Management at Sherritt’s Moa Nickel Mine

Sherritt
Cuba

 | 

2020
Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Water Transportation through Shafts

Open Cast Mine Dewatering

Agnico Eagle Pinos Altos Mine
Mexico

 | 

2017
Test Installation for Transporting Silica Sand.

Transport of Silica Arena: HDPE vs Pexgol

Covia Corp
Mexico

 | 

2019