Skip to content

Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Instalación de 1000 Metros de Tubería PE-X para una Mina Subterránea.

Líneas de Desagüe Minero

Lundin Mining – Mina Alcaparosa
Chile

 | 

2019
Drenaje de Agua desde el Interior de una Mina Subterránea

Drenaje de Agua en Mina Subterránea

El Peñón Yamana Gold, Meridian Mine
Chile

 | 

2016
Reemplazo de Tubería de Acero al Carbón por Pexgol

Transporte de Agua

Cargill
México

 | 

2017
Reemplazo de Tuberías de Acero al Carbono por Pexgol para Red Contra Incendios.

Transporte de Agua para Red Contra Incendios

Profertil
Argentina

 | 

2022
Tubería Pexgol para el Transporte de Efluentes a 30°C / 86°F en una Mina Subterránea.

Bombeo de Efluentes Mineros

AngloGold Ashanti
Brasil

 | 

2019
Suministro de Agua Potable en terrenos dificultoso

Suministro de Agua Potable

Mekorot / Compañía de agua de Beit Shemesh
Israel

 | 

2017