Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Instalación de Tuberías Pexgol para un Sistema de Aire Comprimido.

Sistema de Aire Comprimido para Imprenta

Imprenta Rav-Gon
Israel

 | 

2020
Instalación de Tubería Pexgol para Transporte de Relave Minero.

Transporte de Relaves con 50% de Sólidos

Golden Resource Corp. – Mina Don David Gold
México

 | 

2019
Transporte de agua de pozos

Transporte de Agua de Pozo a Alta Presión

Yamana Gold, Meridian Mine
Chile

 | 

2012
Transporte de Agua a través de Robbins

Desagüe de Tajo Minero

Agnico Eagle Mina Pinos Altos
México

 | 

2017
Instalación de 1000 Metros de Tubería PE-X para una Mina Subterránea.

Líneas de Desagüe Minero

Lundin Mining – Mina Alcaparosa
Chile

 | 

2019
Instalación de una Línea Pexgol a 200 Metros de Profundidad para Mina Subterránea

Conducción de Aire Comprimido

Meridian Mine – Faena El Peñón
Chile

 | 

2018