Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Cómo Pexgol aceleró el suministro y la instalación de una línea crítica en Madagascar.

Solución Integral para Transporte de Agua en Proyectos Urgentes

Madagascar Mining
Madagascar

 | 

2024
Instalación de Tubería Pexgol para Transporte de Relave Minero.

Transporte de Relaves con 50% de Sólidos

Golden Resource Corp. – Mina Don David Gold
México

 | 

2019
Extracción de Agua de Pozo a 200 Metros de Profundidad

Extracción de Agua de Pozo

Doña Inés de Collahuasi SCM, Mina Collahuasi
Chile

 | 

2010
Cómo Gaana Servicios Mineros Transformó sus Manifolds con Tuberías Pexgol.

Soluciones Eficientes para la Minería de Litio

Gaana Servicios Mineros
Argentina

 | 

2024
Transporte de Agua de Río en Terreno Dificultoso.

Transporte de Agua de Rebombeo

Southern Copper Corporation
Perú

 | 

2019
Transporte de Agua desde una Mina Subterránea en Condiciones de Alta Presión

Desagüe de Mina Subterránea

Antofagasta Minerals, Michilla Mine
Chile

 | 

2011