Skip to content

Solución Integral para Transporte de Agua en Proyectos Urgentes

Cómo Pexgol aceleró el suministro y la instalación de una línea crítica en Madagascar.

Caso de Estudio Nº

170

Cliente

Madagascar Mining
Madagascar

|

2024

Condiciones Operativas:

Temperatura: 25°C / 77°F | Caudal: 300 m³/h | Presión: 28 bar | Componentes del fluido: Arena

Tuberías Utilizadas:

Pexgol 280 mm (10″) clases 30, 24, 19 y 15

Uso:

Transporte de agua de río

Largo:

6 km

Categorías:

Comprehensive Water Transportation Solution for Urgent Projects

Solución Pexgol

Pexgol proporcionó una solución ideal para este proyecto mediante el suministro de tuberías de 280 mm (10”) en clases 30, 24, 19 y 15. Estas tuberías fueron seleccionadas debido a su capacidad para manejar altas presiones, su flexibilidad, y su facilidad de instalación. Además, se suministraron en rollos largos de 100, 200 y 300 metros, lo que permitió reducir significativamente la cantidad de conexiones necesarias.

El sistema de accesorios utilizado incluyó coplas de electrofusión, flared ends y bridas sueltas, garantizando conexiones seguras y rápidas. La asistencia técnica de Pexgol incluyó soporte desde la etapa de diseño hasta la instalación en campo, con capacitación y herramientas suministradas para optimizar el proceso.

La Minera evaluó alternativas como tuberías flexibles de acero con recubrimientos de PE, pero estas opciones fueron descartadas debido a los tiempos de entrega prolongados y la necesidad de herramientas especializadas para la instalación.

Pexgol demostró ser la solución más eficiente y viable, ofreciendo una respuesta rápida y adaptada a las necesidades del cliente.

La experiencia con Pexgol en este proyecto subraya su capacidad para superar
desafíos técnicos y logísticos en condiciones exigentes.

The Solution

Pexgol provided an ideal solution for this project by supplying 280 mm (10”) pipes in classes 30, 24, 19, and 15. These pipes were selected due to their ability to handle high pressures, flexibility, and ease of installation. Additionally, they were supplied in long coils of 100, 200, and 300 meters, which significantly reduced the number of required connections.

The fitting system used included electrofusion couplings, flared ends, and loose flanges, ensuring secure and quick connections. Pexgol’s technical support covered the entire process, from design to on-site installation, including training and tools to optimize the project’s execution.

Ambatovy evaluated alternative solutions such as steel flexible pipes with PE coatings but ruled them out due to long delivery times and the need for specialized installation tools. Pexgol proved to be the most efficient and viable solution, providing a fast, tailored response to the client’s needs.

Pexgol’s performance in this project highlights its ability to overcome technical and logistical challenges in demanding conditions.

Casos de Estudio Relacionados

Instalación de Prueba para Transporte de Arena Sílica.

Transporte de Arena Sílica: Codo HDPE vs Pexgol

Covia Corp
México

 | 

2019
Instalación de Tubería Pexgol para el Transporte de Salmuera a Alta Presión en un Pozo.

Transporte de Salmuera a Alta Presión

Mekorot
Israel

 | 

2020
Línea de Licor Ácido con Altos Niveles de Abrasión y Sedimentación

Transporte de Líquido Abrasivo

Moa Nickel S.A. Sherritt
Cuba

 | 

2014
Transporte de sedimentos de salmuera cristalizada (a una concentración del 30%)

Transporte de Cristales de Salmuera

ICL Group, Mar Muerto
Israel

 | 

1992
Extracción de Agua de Pozo a 200 Metros de Profundidad

Extracción de Agua de Pozo

Doña Inés de Collahuasi SCM, Mina Collahuasi
Chile

 | 

2010
Dejando el PVC, Adoptando Pexgol: Garantizando Eficiencia en la Producción de Litio.

Optimización del Transporte de Salmuera de Litio

Puna Mining
Argentina

 | 

2022