Skip to content

Transition to Corrosion-Free Diesel Delivery Systems

Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Case Study Nº

155

Customer

Guaymas Protein
Mexico

|

2023

Working Conditions

Temperature: 30°C / 86°F | Pressure: 5kg

Pexgol Pipes

Pexgol 80 mm (3″), SDR 11

Application

Diesel transport

Lenght

100 m / 328 ft

Categories

Transition to Corrosion-Free Diesel Delivery Systems

The Challenge

Guaymas Protein, a leader in fish-based protein products, faced significant issues with its existing carbon steel pipelines used for diesel transport. The prevalent saline environment in the area led to recurring corrosion of the pipes, resulting in frequent maintenance and replacements to prevent leaks and environmental contamination.

The Solution

By choosing Pexgol’s 3” RD 11 pipes, Guaymas Protein found an effective solution to its corrosion problems. Pexgol pipes, with their superior chemical and corrosion resistance, provided a durable alternative to carbon steel. The flanged coupling used in the installation facilitated a smooth transition, utilizing the existing supports on-site for a quick and simple setup. The lightweight and flexible nature of Pexgol pipes, along with their ability to be delivered in long lengths, significantly sped up the installation process and reduced the need for frequent maintenance, offering a sustainable and efficient system for diesel transportation.

Related Case Studies

Испытательная установка для транспортировки кварцевого песка.

Транспортировка кварцевого песка: сравнение ПЭВП и Pexgol

Covia Corp
Мексика

 | 

2019
850 Meters of Pipe Replaced in Less Than 24 Hours, Without Affecting Residents.

Goodbye Asbestos: Pexgol Modernizes Thermal Water Network

Raquet Club Lake Chapala
Mexico

 | 

2024
Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
Монтаж труб Pexgol на установке подготовки пластовой воды.

Установка водоподготовки для вторичной закачки

YPF
Аргентина

 | 

2020
Replacement of a Drainage Line in an Underground Mine.

Дренаж в подземном руднике

Atacama Kozan
Чили

 | 

2019
600 Meters Installed in a Day: Pexgol Delivers for Kiewit in Power Project.

Pexgol Ensures Water Supply at Mexican Combined-Cycle Power Plant

Kimex
Mexico

 | 

2025