Transition to Corrosion-Free Diesel Delivery Systems

Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Estudo de Caso Nº

155

Cliente

Guaymas Protein
Mexico

|

2023

Condições de Trabalho

Temperature: 30°C / 86°F | Pressure: 5kg

Solução Pexgol

Pexgol 80 mm (3″), SDR 11

Aplicação

Diesel transport

Comprimento

100 m / 328 ft

Categorias

Transition to Corrosion-Free Diesel Delivery Systems

The Challenge

Guaymas Protein, a leader in fish-based protein products, faced significant issues with its existing carbon steel pipelines used for diesel transport. The prevalent saline environment in the area led to recurring corrosion of the pipes, resulting in frequent maintenance and replacements to prevent leaks and environmental contamination.

The Solution

By choosing Pexgol’s 3” RD 11 pipes, Guaymas Protein found an effective solution to its corrosion problems. Pexgol pipes, with their superior chemical and corrosion resistance, provided a durable alternative to carbon steel. The flanged coupling used in the installation facilitated a smooth transition, utilizing the existing supports on-site for a quick and simple setup. The lightweight and flexible nature of Pexgol pipes, along with their ability to be delivered in long lengths, significantly sped up the installation process and reduced the need for frequent maintenance, offering a sustainable and efficient system for diesel transportation.

Estudos de Caso Relacionados

Food Transport Pexgol vs HDPE

Food Transport Pexgol vs HDPE

Marine Farms
Chile

 | 

2017
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
EMESA Optimizes Formation Water Transportation in Mendoza.

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA
Argentina

 | 

2023
Water Drainage From the Inside of an Underground Mine

Water Drainage at an Underground Mine

El Peñón Yamana Gold, Meridian Mine
Chile

 | 

2016
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022