Installation of a drainage system between a well and a mining dam.

Case Study Nº

84

Customer

AquaMag
Colombia

|

2019

Working Conditions

Temperature: ambient | Pressure: 3 bar | Sloping terrain

Pexgol Pipes

Pexgol 160 mm (6″), class 10

Application

Potable water transport

Lenght

188 m

Categories

Installation of a drainage system between a well and a mining dam.

The Challenge

AquaMag, the aqueduct and sewerage company of Santa Rosa de Lima (Colombia), uses pipes that are exposed on the lands or farms of the inhabitants of this population to transport raw water for treatment. Due to uncontrolled agricultural burning on the farms, a section of the existing HDPE pipe was burned.

AquaMag needed to continue supplying drinking water to 1,600 people, transporting 10 liters per second, from the San Sebastián river to Santa Rosa de Lima.

The Solution

The client ultimately decided to install a Pexgol pipe due to its ease of handling on complex terrain, resistance to wear, UV rays (since the pipe was exposed), longer life compared to other materials, and the ability to supply it in rolls, which allowed for fewer joints.

Due to the terrain conditions, the installation took 10 days, which would have taken 25 days if another type of pipe had been used.

43 electrofusion joints were made, as sections of HDPE pipe were replaced by Pexgol in different areas. In critical points, a complete section of Pexgol pipe was used.

Related Case Studies

Прокладка труб из сшитого ПЭ длиной 1000 метров для подземного рудника.

Рудничные дренажные линии

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Прокладка труб из сшитого ПЭ длиной 3000 метров для подземного рудника.

Дренажные линии в подземном руднике

Lundin Mining — Рудник Канделария-Норте
Чили

 | 

2020
How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023
Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Транспортировка пульпы пальмового масла при 95 °C.

Транспортировка пульпы пальмового масла

Компания Loma Fresca
Колумбия

 | 

2017