Drinking Water on Sloping Terrain

Installation of a drainage system between a well and a mining dam.

Estudo de Caso Nº

84

Cliente

AquaMag
Colombia

|

2019

Condições de Trabalho

Temperature: ambient | Pressure: 3 bar | Sloping terrain

Solução Pexgol

Pexgol 160 mm (6″), class 10

Aplicação

Potable water transport

Comprimento

188 m

Categorias

Installation of a drainage system between a well and a mining dam.

The Challenge

AquaMag, the aqueduct and sewerage company of Santa Rosa de Lima (Colombia), uses pipes that are exposed on the lands or farms of the inhabitants of this population to transport raw water for treatment. Due to uncontrolled agricultural burning on the farms, a section of the existing HDPE pipe was burned.

AquaMag needed to continue supplying drinking water to 1,600 people, transporting 10 liters per second, from the San Sebastián river to Santa Rosa de Lima.

The Solution

The client ultimately decided to install a Pexgol pipe due to its ease of handling on complex terrain, resistance to wear, UV rays (since the pipe was exposed), longer life compared to other materials, and the ability to supply it in rolls, which allowed for fewer joints.

Due to the terrain conditions, the installation took 10 days, which would have taken 25 days if another type of pipe had been used.

43 electrofusion joints were made, as sections of HDPE pipe were replaced by Pexgol in different areas. In critical points, a complete section of Pexgol pipe was used.

Estudos de Caso Relacionados

Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
High Pressure Water Transport for a Gold Mine.

High Pressure Water Transport

Mansfield Mine
Argentina

 | 

2019
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020
O sistema de tubulação da Pexgol permitiu que a Nexa Resources renovasse seu processo de gerenciamento de resíduos, reduzindo significativamente o impacto ambiental.

Aprimorando a Gestão de Resíduos da Nexa Resources Usando Pexgol

Nexa Resources
Brasil

 | 

2023
Groundwater Transportation With Ph Low Levels

Groundwater Transportation

Grupo México, Buena Vista del Cobre Mine
Mexico

 | 

2015
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024