Fast and Reliable Solution for Winemaking Processes

How Pexgol streamlined water transportation at Zuccardi Winery

Case Study Nº

172

Customer

Zuccardi Winery
Argentina

|

2024

Working Conditions

Temperature: Ambient | Flow rate: 150 L/min | Pressure: 2 bar | Fluid: Potable water

Pexgol Pipes

Pexgol 90 mm, class 15

Application

Potable water transport

Lenght

120 m / 393 ft

Categories

Fast and Reliable Solution for Winemaking Processes

The Challenge

Zuccardi Winery, internationally acclaimed for its innovation and quality in wine production, needed to implement a potable water transport line to supply both consumption and vinification processes. The challenge was to connect the storage tanks—located in a separate building—to the main plant through a system that ensured a fast, safe, and efficient installation. Additionally, the solution had to minimize leakage risks while optimizing installation time and costs.

The terrain conditions called for a reliable piping system that did not require a sand bed for burial and could be handled easily, considering operational and space constraints around the winery.

The Solution

Zuccardi selected 90 mm Pexgol class 15 pipes for the project. This decision was based on Pexgol’s key advantages, including:

  • Rapid Installation: The 120 meters of pipe were uncoiled and laid out in just 20 minutes.
  • Fewer Joints: Thanks to the long-length coil format, no joints were needed along the run, significantly reducing leakage risks and associated costs.
  • Easy Handling: The lightweight material enabled efficient transport and installation, even under limited operational conditions.
  • Strength and Adaptability: The pipe required no sand bed for burial, simplifying the installation process.

The final installation was carried out two days after trench preparation and took only 2 hours, including burial and backfilling. Both ends of the pipeline were connected using flanged couplings to ensure system integrity.

Related Case Studies

Boosting Productivity and Reducing Maintenance in Livestock Feed Production.

From Steel Struggles to Pexgol Progress

Ambar
Israel

 | 

2022
Installation of a drainage system between a well and a mining dam.

Drinking Water on Sloping Terrain

AquaMag
Colombia

 | 

2019
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Транспортировки суспензии с высоким содержанием никеля

Транспортировка выщелоченной суспензии

Компания Moa Nickel S.A. Sherritt
Куба

 | 

2013
Транспортировка высококоррозийных материалов от сгустителей на установку нейтрализации

Транспортировка коррозионных материалов

Компания Moa Nickel S.A, Sherritt
Куба

 | 

2015
Транспортировка воды из скважины с низким pH.

Транспортировка воды на текстильной фабрике

CMT La Laguna
Мексика

 | 

2018