Fast and Reliable Solution for Winemaking Processes

How Pexgol streamlined water transportation at Zuccardi Winery

Estudo de Caso Nº

172

Cliente

Zuccardi Winery
Argentina

|

2024

Condições de Trabalho

Temperature: Ambient | Flow rate: 150 L/min | Pressure: 2 bar | Fluid: Potable water

Solução Pexgol

Pexgol 90 mm, class 15

Aplicação

Potable water transport

Comprimento

120 m / 393 ft

Categorias

Fast and Reliable Solution for Winemaking Processes

The Challenge

Zuccardi Winery, internationally acclaimed for its innovation and quality in wine production, needed to implement a potable water transport line to supply both consumption and vinification processes. The challenge was to connect the storage tanks—located in a separate building—to the main plant through a system that ensured a fast, safe, and efficient installation. Additionally, the solution had to minimize leakage risks while optimizing installation time and costs.

The terrain conditions called for a reliable piping system that did not require a sand bed for burial and could be handled easily, considering operational and space constraints around the winery.

The Solution

Zuccardi selected 90 mm Pexgol class 15 pipes for the project. This decision was based on Pexgol’s key advantages, including:

  • Rapid Installation: The 120 meters of pipe were uncoiled and laid out in just 20 minutes.
  • Fewer Joints: Thanks to the long-length coil format, no joints were needed along the run, significantly reducing leakage risks and associated costs.
  • Easy Handling: The lightweight material enabled efficient transport and installation, even under limited operational conditions.
  • Strength and Adaptability: The pipe required no sand bed for burial, simplifying the installation process.

The final installation was carried out two days after trench preparation and took only 2 hours, including burial and backfilling. Both ends of the pipeline were connected using flanged couplings to ensure system integrity.

Estudos de Caso Relacionados

Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Test Installation for Transporting Silica Sand.

Transport of Silica Arena: HDPE vs Pexgol

Covia Corp
Mexico

 | 

2019
Overcoming Corrosion Challenges in the Oil Industry

Overcoming Corrosion Challenges in the Oil Industry

Petróleos Sudamericanos
Argentina

 | 

2023
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023