Optimization of Lithium Brine Transportation

Moving from PVC to Pexgol: Ensuring Efficiency in Lithium Production

Case Study Nº

143

Customer

Puna Mining
Argentina

|

2022

Working Conditions

Flow: 77m³/h | Pressure: 60 psi

Pexgol Pipes

Pexgol 2”, 5” & 6”, class 15

Application

Transport of raw brine

Lenght

2 km

Categories

Optimization of Lithium Brine Transportation

The Challenge

Puna Mining S.A., a pioneer in high-quality battery-grade lithium carbonate production (99.5% purity) in Argentina, faced operational challenges with its brine transportation system. Founded in 2017 by Pablo Alurralde and later forming a joint venture with Argosy Minerals Ltd., the company was committed to utilizing cutting-edge technology in its production processes. However, their existing PVC piping presented significant limitations, requiring constant maintenance, frequent pipe replacements, and struggling with ongoing crystallization issues, which directly affected efficiency and increased operational costs.

Pexgol Solution

Pexgol stepped in with a tailored solution to address Puna Mining’s challenges.
The introduction of Pexgol pipes of 6, 2, and 5 inches over a 2-kilometer stretch was designed to meet the specific demands of raw brine transportation.
The complete installation was accomplished in just three days, highlighting the ease and efficiency of Pexgol pipes.
ArgPex provided on-site training to ensure a smooth and optimized installation process.

Benefits of Switching to Pexgol
By adopting Pexgol pipes, the following advantages were realized:

  • Rapid installation
  • High chemical and corrosion resistance
  • Material flexibility
  • Long lifespan
  • Reduced thermal conductivity
  • Lightweight pipes
  • Availability in long rolls for easier handling and installation

Related Case Studies

Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
High-pressure water transport for the Southern Pit in a copper and zinc mine.

High-pressure fluid transport

Minera Antapaccay
Peru

 | 

2023
Горячий сильвинитовый насыщенный рассол с температурой 114 °C (237 °F)

Переработка минерального сырья — установка по переработке углекислого калия

ICL group, работы на Мертвом море
Израиль

 | 

1987
Замена титановых труб на трубы Pexgol для транспортировки кислого раствора.

Обогатительный комбинат: транспортировка выщелоченной пульпы

Barrick Gold — Пуэбло Вьехо
Доминиканская Республика

 | 

2018
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Транспортировка воды более чем на 150 карьерных транспортных развязках

Транспортировка воды на транспортных развязках

Компания Doña Inés de Collahuasi SCM, шахта Collahuasi
Чили

 | 

2012