Skip to content

Transportation of Water with Solids

Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Case Study Nº

111

Customer

Kofanor
Mexico

|

2022

Working Conditions

Fluid: process water with solids (feathers, bones, viscera, etc.) | Temperature: 26°C / 78°F | Gravity transport

Pexgol Pipes

Pexgol 6”, class 11

Application

Transport of process water with solids

Lenght

160 m / 524 ft

Categories

The Challenge

Kofanor, a Mexican industrial company dedicated to the transformation of meat waste into flour and oil through a thermal process, resulting in a protein ingredient for the manufacture of animal feed.

Kofanor was looking to install an underground line to transport process water from a manhole to a sump. Two options were contemplated for this project, carbon steel or stainless steel pipes, however the first one was not an option due to the corrosion that they present over time, and stainless steel resulted in a very high operating cost.

Pexgol Solution

It was decided to use Pexgol due to the great facility to carry out the installation, where no joint or sand bed was required for the 140 meters of route where the pipe would be buried. Pexgol was cheaper compared to carbon steel and stainless steel.

Likewise, no special equipment was required to carry out the installation, since the plant had a backhoe and forklift with which they were able to uncoil the pipe without any problem.

Related Case Studies

Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
Boosting Productivity and Reducing Maintenance in Livestock Feed Production.

From Steel Struggles to Pexgol Progress

Ambar
Israel

 | 

2022
Осушение шахты в условиях высокого давления

Осушение шахты — в условиях высокого давления

Antofagasta Minerals, шахта «Михилья»
Чили

 | 

2011
Откачка воды без опор

Откачка воды из карьера

Компания Arcelor Mittal, шахта El Volcan
Мексика

 | 

2017
Moving from PVC to Pexgol: Ensuring Efficiency in Lithium Production

Optimization of Lithium Brine Transportation

Puna Mining
Argentina

 | 

2022
Transport of acid water at high temperatures

Water Transport with Low pH Level

Moa Nickel S.A. Sherritt
Cuba

 | 

2010