Meltdown Water Transport
Pipe installation on a mountain
Case Study Nº
16
Customer
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Working Conditions
Complex & harsh ground, 300 m altitude.
Pexgol Pipes
Pexgol 315 mm, Class 15 (SDR 11).
Application
Water transportation.
Lenght
3,300 m.
Categories

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Related Case Studies
Transporting Brine at High Pressure
Mekorot
Israel
|
2020
High Pressure Drain in Underground Mine
Ojos del Salado Mine – Lundin Mining
Chile
|
2018
Water Drainage in Underground Mine
NEMISA Mine
Mexico
|
2018
Transport of Compressed Air
Meridian Mine – Faena El Peñón
Chile
|
2018