Abrasive Liquid Transportation

Acid liquor line with high levels of abrasion and sedimentation

Case Study Nº

21

Customer

Moa Nickel S.A. Sherritt
Cuba

|

2014

Working Conditions

70°C – 3 Bars.

Pexgol Pipes

Pexgol 355 mm & Pexgol 315 mm, Class 12.

Application

Acid liquor transportation with nickel, iron, cobalt and NaOH particles.

Lenght

150 m.

Categories

Acid liquor line with high levels of abrasion and sedimentation

The Challenge

Moa Nickel used rubber lined steel pipes to transport acid liquor.

Between 3 and 6 months they required to stop the plant for more than 24 hours, due to sedimentation issues that the steel pipe presented, reducing it inside diameter 60% less.

Furthermore, the steel pipe suffered leaks due to lined releases. Since the first moment that the liquid touched the steel, in a matter of minutes it was causing a leak.

Pexgol Solution

Golan provided Pexgol pipes of 355 mm and 315 mm with mechanical joints, and it only required to stop the plant one year after of the installation.

During that time, and due to the high sedimentation levels, the inside diameter was reduced just 30% less. The repair lasted only 4 hours, and it was done by hammer blows, in order to remove the material that

was obstructing the pipe. At the end, the pipe was functioning without problems.

Pexgol, it not only achieved to raise the production, but also the maintenance expenses were reduced. For every hour that the plant stopped, it cost hundreds of dollars to the company.

Related Case Studies

Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Replacing HDPE pipes with Pexgol allowed Vale to simplify operations, eliminate auxiliary equipment, and achieve a permanent installation under extreme conditions.

Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine

Vale
Brazil

 | 

2024