Drinking Water on Sloping Terrain

Installation of a drainage system between a well and a mining dam.

Case Study Nº

84

Customer

AquaMag
Colombia

|

2019

Working Conditions

Temperature: ambient | Pressure: 3 bar | Sloping terrain

Pexgol Pipes

Pexgol 160 mm (6″), class 10

Application

Potable water transport

Lenght

188 m

Categories

Installation of a drainage system between a well and a mining dam.

The Challenge

AquaMag, the aqueduct and sewerage company of Santa Rosa de Lima (Colombia), uses pipes that are exposed on the lands or farms of the inhabitants of this population to transport raw water for treatment. Due to uncontrolled agricultural burning on the farms, a section of the existing HDPE pipe was burned.

AquaMag needed to continue supplying drinking water to 1,600 people, transporting 10 liters per second, from the San Sebastián river to Santa Rosa de Lima.

The Solution

The client ultimately decided to install a Pexgol pipe due to its ease of handling on complex terrain, resistance to wear, UV rays (since the pipe was exposed), longer life compared to other materials, and the ability to supply it in rolls, which allowed for fewer joints.

Due to the terrain conditions, the installation took 10 days, which would have taken 25 days if another type of pipe had been used.

43 electrofusion joints were made, as sections of HDPE pipe were replaced by Pexgol in different areas. In critical points, a complete section of Pexgol pipe was used.

Related Case Studies

Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

From carbon steel to Pexgol: A victory against corrosion

Profertil
Argentina

 | 

2021
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Securing the future of gold mining: Newmont Corporation chooses Pexgol for water transport

Newmont’s Water Transportation Revolution with Pexgol Pipes

Newmont Corporation
Argentina

 | 

2018
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022
Changing carbon steel for efficiency: Pexgol PE-X pipes in Aconcagua Energía

Elevating Efficiency in Hydrocarbon Exploitation

Aconcagua Energía
Argentina

 | 

2023
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023