Overcoming Piping Challenges in Hydrocarbon Transportation

Pexgol’s Piping Solution for Regal Petroleum.

Case Study Nº

152

Customer

Regal Petroleum Corporation
Ukraine

|

2023

Working Conditions

Temperature: 15°C / 59°F | Flow: 4.2 – 8.4 m³/hour | Pressure: 17 bar | Fluid components: formation water with 20% methanol and hydrocarbons less than 1% | Additional Factors: pH 4.4, high mineralization (13.8% NaCl+KCl, 3.2% CaCl2)

Pexgol Pipes

Pexgol 110 mm, class 19

Application

Formation Water Transportation

Lenght

3,402 m / 11,159 ft

Categories

Overcoming Piping Challenges in Hydrocarbon Transportation

The Challenge

Regal Petroleum Corporation Limited, operating in Ukraine’s Poltava region, faced a significant issue with their existing carbon steel pipeline. Tasked with transporting formation water containing methanol and traces of hydrocarbons, the pipeline suffered from severe corrosion. Additionally, the requirement for underground installation with horizontal directional drilling further complicated the scenario. The project, set in 2023, demanded a durable, corrosion-resistant solution for a pipeline of 110 mm in diameter, stretching over 3,402 meters (11,159 feet) through varied underground conditions. The transportation environment involved a maximum temperature of 15°C (59°F), a fluid flow rate between 4.2 and 8.4 m³/hour, and a pressure of 17 bar. The fluid’s composition was challenging, comprising 20% methanol, less than 1% hydrocarbons and formation water with a pH of 4.4 and high mineralization.

Pexgol Solution

Pexgol presented a comprehensive solution with their PE-X pipes, designed to address the intricate needs of Regal Petroleum.
The installation utilized EF couplers and transition nipples for seamless integration with the existing steel pipeline. Pexgol’s approach emphasized fast installation, lightweight handling, and the efficient transportation of pipes in coils. The initial decoiling process faced hurdles when using a bulldozer, leading to a revised strategy of horizontal uncoiling. A trencher and the Ditch Witch JT3020 drilling equipment facilitated the underground installation, achieving a pullback speed of 0.6 meters per minute.

A key aspect of the project was the customer-specific request for pressure testing:
one 300-meter coil underwent a rigorous test, sustaining a static pressure of 24 bar for 6 hours, validating its suitability for horizontal directional drilling. This demonstrated Pexgol’s ability to meet specialized requirements and underscored their commitment to quality assurance. The successful implementation of Pexgol’s piping system provided a robust, flexible, and corrosion-resistant solution, effectively meeting the complex demands of underground hydrocarbon transportation.

Related Case Studies

Greater operational efficiency with fewer joints and fast implementation.

Fresh Water Line Optimization in an Oil Field in Argentina

Phoenix Global Resources
Argentina

 | 

2025
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987
Enhanced hydraulic and structural reliability for critical community infrastructure.

Optimization of Potable Water Supply for 1,600 residents

Rincón de la Candelaria
Mexico

 | 

2025
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018