Transportation of Phosphoric Acid

Transportation of Phosphoric acid in a potassium nitrate plant

Case Study Nº

13

Customer

Haifa Chemicals
Israel

|

1995

Working Conditions

Phosphoric acid up to 85%. The maximum working condition is 6 bar and 80°C.

Pexgol Pipes

Pexgol ½” (16 mm) up to 14” (355 mm).

Application

Phosphoric acid.

Lenght

1000 meters.

Categories

Transportation of Phosphoric acid in a potassium nitrate plant

The Challenge

Corrosion in the pipes and leakages in the connections. Frequent replacement needed. Fiberglas and Rubber lined steel pipes are hard to maintain.

Pipe materials tried prior to Pexgol:

  • Rubber lined steel pipes in short sections
  • Fiberglass pipes

Pexgol Solution

Haifa Chemicals use Pexgol (PEX) pipes very successfully, since 1995 in all their process.

Diametr of ½” (16 mm) up to 14” (355 mm)

Pexgol pipes are used in the Phosphoric acid plant, in the potassium nitrate plant and in the waste treatment plant. Pexgol pipes work with Phosphoric acid up to 85%, The maximum working condition is 6 bar and 80 degrees Celsius.

The Economic

The original mean time between failures (MTBF) was short due to frequent leakages. Changing to Pexgol eliminated faileures completely.

No maintenance required.

Related Case Studies

Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020
The impact of Pexgol piping on pump performance improvement and maintenance cost reduction at Sales de Jujuy.

Improvement in Brine Management through Pexgol Piping

Sales de Jujuy
Argentina

 | 

2023
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019
Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023