Transportation of Phosphoric Acid

Transportation of Phosphoric acid in a potassium nitrate plant

Estudo de Caso Nº

13

Cliente

Haifa Chemicals
Israel

|

1995

Condições de Trabalho

Phosphoric acid up to 85%. The maximum working condition is 6 bar and 80°C.

Solução Pexgol

Pexgol ½” (16 mm) up to 14” (355 mm).

Aplicação

Phosphoric acid.

Comprimento

1000 meters.

Categorias

Transportation of Phosphoric acid in a potassium nitrate plant

The Challenge

Corrosion in the pipes and leakages in the connections. Frequent replacement needed. Fiberglas and Rubber lined steel pipes are hard to maintain.

Pipe materials tried prior to Pexgol:

  • Rubber lined steel pipes in short sections
  • Fiberglass pipes

Pexgol Solution

Haifa Chemicals use Pexgol (PEX) pipes very successfully, since 1995 in all their process.

Diametr of ½” (16 mm) up to 14” (355 mm)

Pexgol pipes are used in the Phosphoric acid plant, in the potassium nitrate plant and in the waste treatment plant. Pexgol pipes work with Phosphoric acid up to 85%, The maximum working condition is 6 bar and 80 degrees Celsius.

The Economic

The original mean time between failures (MTBF) was short due to frequent leakages. Changing to Pexgol eliminated faileures completely.

No maintenance required.

Estudos de Caso Relacionados

Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
Pexgol’s Piping Solution for Regal Petroleum.

Overcoming Piping Challenges in Hydrocarbon Transportation

Regal Petroleum Corporation
Ukraine

 | 

2023
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017