Skip to content

Water Lines – Harsh Conditions

Transportation of brackish water to the main pumping station

Case Study Nº

9

Customer

Dead Sea Works
Israel

|

1993

Working Conditions

Over 20 years of direct sunlight (UV) exposure. Ambient temperature variation from 47°C to -5°C (116°F to 23°F). Rock build-up from seasonal floods.

Pexgol Pipes

Pexgol ѓ355 Class 10 (SDR 16.2).

Application

Brackish water transportation.

Lenght

120 meters.

Categories

Water Lines - Harsh Conditions

The Challenge

The Rahaf dry riverbed has several powerful seasonal floods every year, causing heavy rocks and soil to drift and swipe everything in its way.

In order to transport water to the main pumping station, which supplied water from the sea to the plant, Dead Sea Works had to lay a waterline of 100 meters across the Rahaf dry riverbed.

Original asbestos pipe laid in a trench crossing the riverbed but the floods uncovered the pipe and damaged it, requiring the replacement of the pipe.

Pexgol Solution

A Pexgol ѓ355 Class 10 (SDR 16.2) pipe was laid in a ditch across the riverbed, without sand embedding.

The original pipe was made from combined short sections that required a complex installation and reinforced foundations. The Mean Time Between Failures (MTBF) was two years.

Since the easy installation of the Pexgol pipe in 1993, it has been working with no failures.

Related Case Studies

Reducing maintenance and increasing safety in hydraulic backfill operations.

Pexgol Simplifies Slurry Transportation at Buriticá Mine

Zijin - Continental Gold
Colombia

 | 

2023
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023
Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Sewage Water Transportation

BorsodChem
Hungary

 | 

2011
Trial Demonstrates Superior Wear Resistance in Sea Water + Ash Slurry Conditions.

Unmatched Durability in Harsh Slurry: Pexgol Outperforms Steel

Tata Power
India

 | 

2023
Water Extraction From A Middle Pool To The Exterior Of The Mine

Dewatering at an Open Cast Mine

Codelco, Ministro Hales Division
Chile

 | 

2016
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019