Transportation of brackish water to the main pumping station

Case Study Nº

9

Customer

Dead Sea Works
Israel

|

1993

Working Conditions

Over 20 years of direct sunlight (UV) exposure. Ambient temperature variation from 47°C to -5°C (116°F to 23°F). Rock build-up from seasonal floods.

Pexgol Pipes

Pexgol ѓ355 Class 10 (SDR 16.2).

Application

Brackish water transportation.

Lenght

120 meters.

Categories

Water Lines - Harsh Conditions

The Challenge

The Rahaf dry riverbed has several powerful seasonal floods every year, causing heavy rocks and soil to drift and swipe everything in its way.

In order to transport water to the main pumping station, which supplied water from the sea to the plant, Dead Sea Works had to lay a waterline of 100 meters across the Rahaf dry riverbed.

Original asbestos pipe laid in a trench crossing the riverbed but the floods uncovered the pipe and damaged it, requiring the replacement of the pipe.

Pexgol Solution

A Pexgol ѓ355 Class 10 (SDR 16.2) pipe was laid in a ditch across the riverbed, without sand embedding.

The original pipe was made from combined short sections that required a complex installation and reinforced foundations. The Mean Time Between Failures (MTBF) was two years.

Since the easy installation of the Pexgol pipe in 1993, it has been working with no failures.

Related Case Studies

Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022
Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Transportation of Water with Solids

Kofanor
Mexico

 | 

2022
Transforming water transportation with Pexgol technology

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Comisión Federal de Electricidad
Mexico

 | 

2023
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Dewatering without Supports

Open Cast Mine Dewatering

El Volcan Mine Arcelor Mittal
Mexico

 | 

2017
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023