Skip to content

Water Transport with Low pH Level

Transport of acid water at high temperatures

Case Study Nº

2

Customer

Moa Nickel S.A. Sherritt
Cuba

|

2010

Working Conditions

Up to 65°C, 13 bars.

Pexgol Pipes

Pexgol 225 mm, Class 24 (SDR 7.3).

Application

Transportation of Acid Water.

Lenght

2500 m.

Categories

Level pH Low with Transport Water

The Challenge

Moa Nickel required to transport a big amount of overflow acid water from the sedimentation tanks to the slurry thickeners plant.

This overflow water substituted the reposition water that the slurry thickeners used.

The client debated regarding the use of a stainless steel pipe SS316L or thermoplastic flexible materials such as HDPE and polyethylene.

Pexgol Solution

At the end, Moa Nickel decided to use Pexgol pipes in long sections, instead of short ones of HDPE and polyethylene, as the best solution for the line, because this type of materials didn’t allow to work under the security standards in the allowable installation time.

The Pexgol pipe was installed in just 8 days with success. The fact that it didn’t require to create a sand bed and the high productivity for its installation in long sections, reduced to the half the installation time for this project. At the end, the client got 25% savings in comparison with the other possible materials.

Related Case Studies

Replacement of Carbon Steel Pipes with Pexgol for the Transportation of Natural Gas.

Natural Gas Transportation with Pexgol

YPF
Argentina

 | 

2022
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Safety and durability: The heart of our solutions

Minera Fresnillo
Mexico

 | 

2021
 How Pexgol streamlined water transportation at Zuccardi Winery

Fast and Reliable Solution for Winemaking Processes

Zuccardi Winery
Argentina

 | 

2024
Lasta2 Filter Press Feed Lines

Concentrated Copper Transportation

BHP Billiton, Olympic Dam, Australia
Australia

 | 

2014
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015