Pexgol for Centrifugal Pump Test

Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Case Study Nº

107

Customer

Flowserve
Argentina

|

2022

Working Conditions

Flow: 7 kg/cm2 | Temperature: 55°C / 131°F

Pexgol Pipes

Pexgol 250 mm, class 12 + Tee fittings & flanged electrofusion elbow

Application

Centrifugal pump testing

Lenght

36 m / 118 ft

Categories

Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps

The Challenge

Flowserve is an American multinational corporation and one of the largest providers of industrial and environmental machinery such as pumps, valves, mechanical end seals, automation, and services to the power, oil, gas, chemical, and other industries.

To carry out tests on centrifugal pumps in the laboratory, the company used 10-inch carbon steel pipes. As the design is different in each case, the assembly and disassembly of very heavy pipes were periodically required with the risk that this implies. It was also necessary to use chemical products to prevent corrosion of the pipe.

Pexgol Solution

The client decided to replace its carbon steel pipes with Pexgol. Since they are 6 times lighter than carbon steel pipes. Therefore, they allowed to reduce the assembly and disassembly times, with less personnel and lower risks of accidents for the operators. On the other hand, the problem of corrosion that attacked the steel pipes was completely ruled out.

The joints used at the ends of the pipes were flanged mechanical couplings. In addition, Tee fittings and flanged Pexgol elbows were used.

Related Case Studies

Pexgol enabled a safe and efficient installation across a highly constrained refinery layout.

Nitrogen Transport in a Complex Industrial Environment

YPF
Argentina

 | 

2025
Pexgol reduced the number of joints, accelerated installation, and improved network reliability.

2,900 Meters of Pexgol Installed and Pressure-Tested in Just 3 Days

Petróleos Sudamericanos
Argentina

 | 

2026
Record-time intervention that avoided operational losses in a dehydration plant.

Critical Pipeline Replacement in Dehydration Plant with Operational Continuity

Petróleos Sudamericanos
Argentina

 | 

2025
Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Abrasive Tailings Transport

Pirquitas Mine
Argentina

 | 

2015
Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018
Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.

Dewatering Through Shafts

Esan Eczacibasi Endustriyel Hammaddeler
Turkey

 | 

2019