Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Case Study Nº

107

Customer

Flowserve
Argentina

|

2022

Working Conditions

Flow: 7 kg/cm2 | Temperature: 55°C / 131°F

Pexgol Pipes

Pexgol 250 mm, class 12 + Tee fittings & flanged electrofusion elbow

Application

Centrifugal pump testing

Lenght

36 m / 118 ft

Categories

Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps

The Challenge

Flowserve is an American multinational corporation and one of the largest providers of industrial and environmental machinery such as pumps, valves, mechanical end seals, automation, and services to the power, oil, gas, chemical, and other industries.

To carry out tests on centrifugal pumps in the laboratory, the company used 10-inch carbon steel pipes. As the design is different in each case, the assembly and disassembly of very heavy pipes were periodically required with the risk that this implies. It was also necessary to use chemical products to prevent corrosion of the pipe.

Pexgol Solution

The client decided to replace its carbon steel pipes with Pexgol. Since they are 6 times lighter than carbon steel pipes. Therefore, they allowed to reduce the assembly and disassembly times, with less personnel and lower risks of accidents for the operators. On the other hand, the problem of corrosion that attacked the steel pipes was completely ruled out.

The joints used at the ends of the pipes were flanged mechanical couplings. In addition, Tee fittings and flanged Pexgol elbows were used.

Related Case Studies

Water Drainage From the Inside of an Underground Mine

Water Drainage at an Underground Mine

El Peñón Yamana Gold, Meridian Mine
Chile

 | 

2016
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013
Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Installation of a Fire Supply Network in a Oil Treatment Plant.

Fire Network Supply

YPF
Argentina

 | 

2021