Skip to content

Pexgol Replaces Short-Lived HDPE in Coarse Tailings Service

A 225 mm Pexgol pipeline designed for abrasive slurry containing 35% NaCl and KCl solids.

Caso de Estudio Nº

196

Cliente

Potash Mine
Canada

|

2026

Condiciones Operativas:

Operating temperature: 30 °C / 86 °F | Flow rate: 270 gpm | Fluid: NaCl/KCl slurry | Solids concentration: 35%

Tuberías Utilizadas:

Pexgol 225 mm, SDR 9 / Class 19

Uso:

Coarse tailings screen feed

Largo:

117 m / 384 ft

Categorías:

Pexgol Replaces Short-Lived HDPE in Coarse Tailings Service

The Challenge

A major Canadian potash producer operates mining and processing facilities that supply essential crop nutrients to agricultural markets.

At one of its Canadian operations, an existing pipeline transported slurry to the coarse tailings screen. The gravity-fed line handled a mixture of sodium chloride and potassium chloride at approximately 30°C, with a solids concentration of 35% and a flow rate of 270 gpm.

The original pipeline was manufactured from HDPE 4710, SDR 13.5. Under these abrasive operating conditions, it provided a service life of only two to three years. The need for recurring replacement prompted the mine to seek a more abrasion-resistant piping solution capable of extending the system’s operating life.

The replacement also needed to integrate with the existing HDPE support arrangement to avoid extensive modifications to the surrounding infrastructure.

The Solution

In 2026, the Canadian potash producer installed 117 meters (384 feet) of 225 mm Pexgol Class 19 pipe for the coarse tailings screen feed line.

Pexgol was selected primarily for its high resistance to abrasion, chemicals and corrosion, as well as its long-term durability in demanding slurry applications. Its flexibility and compatibility with the supports already installed for the previous HDPE line enabled a direct replacement while minimizing the need for structural changes.

The pipeline was assembled using GP mechanical couplers. Because of the restricted installation space and tight tolerances, particular attention was required when positioning the couplers and tightening their bolts. Turnbuckles were also maintained on the elbows during installation to preserve their intended geometry.

The installation was completed successfully. By replacing the short-lived HDPE pipeline with Pexgol, the mine implemented a solution designed to provide a longer service life in the abrasive NaCl/KCl slurry while making practical use of the existing support infrastructure.

Casos de Estudio Relacionados

Reemplazo de Tuberías de Acero al Carbono por Pexgol para Red Contra Incendios.

Transporte de Agua para Red Contra Incendios

Profertil
Argentina

 | 

2022
Transporte de sedimentos de salmuera cristalizada (a una concentración del 30%)

Transporte de Cristales de Salmuera

ICL Group, Mar Muerto
Israel

 | 

1992
Transporte de Pulpa Mineral de Bauxita a 95°C / 203°F

Planta de Alúmina: Transporte de Lechada Mineral

Planta de Alúmina – Rusal
Rusia

 | 

2013
Un caso de estudio sobre la ingeniería colaborativa y la implementación estratégica del sistema de tuberías Pexgol para la seguridad pública y la eficiencia.

Innovación en seguridad: Tuberías Pexgol para el suministro de GLP

Rawabi City
Israel

 | 

2010
Sustitución de un Spool de Acero por PE-X Revestido para Bombeo de Agua de Formación.

Reemplazo de un Spool de Acero por Pexgol

Enap Sipetrol
Ecuador

 | 

2021
Transporte de Agua desde una Mina Subterránea en Condiciones de Alta Presión

Desagüe de Mina Subterránea

Antofagasta Minerals, Michilla Mine
Chile

 | 

2011