Skip to content

Pexgol Replaces Short-Lived HDPE in Coarse Tailings Service

A 225 mm Pexgol pipeline designed for abrasive slurry containing 35% NaCl and KCl solids.

Estudo de Caso Nº

196

Cliente

Potash Mine
Canada

|

2026

Condições de Trabalho

Operating temperature: 30 °C / 86 °F | Flow rate: 270 gpm | Fluid: NaCl/KCl slurry | Solids concentration: 35%

Solução Pexgol

Pexgol 225 mm, SDR 9 / Class 19

Aplicação

Coarse tailings screen feed

Comprimento

117 m / 384 ft

Categorias

Pexgol Replaces Short-Lived HDPE in Coarse Tailings Service

The Challenge

A major Canadian potash producer operates mining and processing facilities that supply essential crop nutrients to agricultural markets.

At one of its Canadian operations, an existing pipeline transported slurry to the coarse tailings screen. The gravity-fed line handled a mixture of sodium chloride and potassium chloride at approximately 30°C, with a solids concentration of 35% and a flow rate of 270 gpm.

The original pipeline was manufactured from HDPE 4710, SDR 13.5. Under these abrasive operating conditions, it provided a service life of only two to three years. The need for recurring replacement prompted the mine to seek a more abrasion-resistant piping solution capable of extending the system’s operating life.

The replacement also needed to integrate with the existing HDPE support arrangement to avoid extensive modifications to the surrounding infrastructure.

The Solution

In 2026, the Canadian potash producer installed 117 meters (384 feet) of 225 mm Pexgol Class 19 pipe for the coarse tailings screen feed line.

Pexgol was selected primarily for its high resistance to abrasion, chemicals and corrosion, as well as its long-term durability in demanding slurry applications. Its flexibility and compatibility with the supports already installed for the previous HDPE line enabled a direct replacement while minimizing the need for structural changes.

The pipeline was assembled using GP mechanical couplers. Because of the restricted installation space and tight tolerances, particular attention was required when positioning the couplers and tightening their bolts. Turnbuckles were also maintained on the elbows during installation to preserve their intended geometry.

The installation was completed successfully. By replacing the short-lived HDPE pipeline with Pexgol, the mine implemented a solution designed to provide a longer service life in the abrasive NaCl/KCl slurry while making practical use of the existing support infrastructure.

Estudos de Caso Relacionados

Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Comparison of brine transport

Albemarle Salar
Chile

 | 

2020
A Two-Phase Installation for High-Temperature Hot Water Supply & Return.

Scaling Up Efficiency: District Energy at Penn State Harrisburg

Penn State University - Harrisburg
USA

 | 

2021
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016
Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Tailing Lines

Ambatovy
Madagascar

 | 

2017