Skip to content

Solución Integral para Transporte de Agua en Proyectos Urgentes

Cómo Pexgol aceleró el suministro y la instalación de una línea crítica en Madagascar.

Caso de Estudio Nº

170

Cliente

Madagascar Mining
Madagascar

|

2024

Condiciones Operativas:

Temperatura: 25°C / 77°F | Caudal: 300 m³/h | Presión: 28 bar | Componentes del fluido: Arena

Tuberías Utilizadas:

Pexgol 280 mm (10″) clases 30, 24, 19 y 15

Uso:

Transporte de agua de río

Largo:

6 km

Categorías:

Comprehensive Water Transportation Solution for Urgent Projects

Solución Pexgol

Pexgol proporcionó una solución ideal para este proyecto mediante el suministro de tuberías de 280 mm (10”) en clases 30, 24, 19 y 15. Estas tuberías fueron seleccionadas debido a su capacidad para manejar altas presiones, su flexibilidad, y su facilidad de instalación. Además, se suministraron en rollos largos de 100, 200 y 300 metros, lo que permitió reducir significativamente la cantidad de conexiones necesarias.

El sistema de accesorios utilizado incluyó coplas de electrofusión, flared ends y bridas sueltas, garantizando conexiones seguras y rápidas. La asistencia técnica de Pexgol incluyó soporte desde la etapa de diseño hasta la instalación en campo, con capacitación y herramientas suministradas para optimizar el proceso.

La Minera evaluó alternativas como tuberías flexibles de acero con recubrimientos de PE, pero estas opciones fueron descartadas debido a los tiempos de entrega prolongados y la necesidad de herramientas especializadas para la instalación.

Pexgol demostró ser la solución más eficiente y viable, ofreciendo una respuesta rápida y adaptada a las necesidades del cliente.

La experiencia con Pexgol en este proyecto subraya su capacidad para superar
desafíos técnicos y logísticos en condiciones exigentes.

The Solution

Pexgol provided an ideal solution for this project by supplying 280 mm (10”) pipes in classes 30, 24, 19, and 15. These pipes were selected due to their ability to handle high pressures, flexibility, and ease of installation. Additionally, they were supplied in long coils of 100, 200, and 300 meters, which significantly reduced the number of required connections.

The fitting system used included electrofusion couplings, flared ends, and loose flanges, ensuring secure and quick connections. Pexgol’s technical support covered the entire process, from design to on-site installation, including training and tools to optimize the project’s execution.

Ambatovy evaluated alternative solutions such as steel flexible pipes with PE coatings but ruled them out due to long delivery times and the need for specialized installation tools. Pexgol proved to be the most efficient and viable solution, providing a fast, tailored response to the client’s needs.

Pexgol’s performance in this project highlights its ability to overcome technical and logistical challenges in demanding conditions.

Casos de Estudio Relacionados

Caso de Éxito: La Solución de Pexgol en la Planta de Aceite de Palma.

Eficiencia y Durabilidad en el Manejo de Agua Lodosa

Industrial Aceitera del Casanare
Colombia

 | 

2023
Transporte de salmuera a 114°C de temperatura

Transporte de salmuera a 114°C

ICL Group, Mar Muerto
Israel

 | 

1987
Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: Transformando el Transporte de Relaves

Syncrude
Canadá

 | 

2022
Transporte de Pulpa de Aceite de Palma a 95°C.

Transporte de Pulpa de Aceite de Palma

Loma Fresca
Colombia

 | 

2017
Pan American Energy implementa una solución eficiente y sostenible para el transporte de salmuera.

Transporte de salmuera rápido y seguro en el Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
Reemplazo de tubería HDPE por Pexgol en terreno complejo.

Agua Potable en Terreno Inclinado

AquaMag
Colombia

 | 

2019

Categorias: