Skip to content

Solución Integral para Transporte de Agua en Proyectos Urgentes

Cómo Pexgol aceleró el suministro y la instalación de una línea crítica en Madagascar.

Caso de Estudio Nº

170

Cliente

Madagascar Mining
Madagascar

|

2024

Condiciones Operativas:

Temperatura: 25°C / 77°F | Caudal: 300 m³/h | Presión: 28 bar | Componentes del fluido: Arena

Tuberías Utilizadas:

Pexgol 280 mm (10″) clases 30, 24, 19 y 15

Uso:

Transporte de agua de río

Largo:

6 km

Categorías:

Comprehensive Water Transportation Solution for Urgent Projects

Solución Pexgol

Pexgol proporcionó una solución ideal para este proyecto mediante el suministro de tuberías de 280 mm (10”) en clases 30, 24, 19 y 15. Estas tuberías fueron seleccionadas debido a su capacidad para manejar altas presiones, su flexibilidad, y su facilidad de instalación. Además, se suministraron en rollos largos de 100, 200 y 300 metros, lo que permitió reducir significativamente la cantidad de conexiones necesarias.

El sistema de accesorios utilizado incluyó coplas de electrofusión, flared ends y bridas sueltas, garantizando conexiones seguras y rápidas. La asistencia técnica de Pexgol incluyó soporte desde la etapa de diseño hasta la instalación en campo, con capacitación y herramientas suministradas para optimizar el proceso.

La Minera evaluó alternativas como tuberías flexibles de acero con recubrimientos de PE, pero estas opciones fueron descartadas debido a los tiempos de entrega prolongados y la necesidad de herramientas especializadas para la instalación.

Pexgol demostró ser la solución más eficiente y viable, ofreciendo una respuesta rápida y adaptada a las necesidades del cliente.

La experiencia con Pexgol en este proyecto subraya su capacidad para superar
desafíos técnicos y logísticos en condiciones exigentes.

The Solution

Pexgol provided an ideal solution for this project by supplying 280 mm (10”) pipes in classes 30, 24, 19, and 15. These pipes were selected due to their ability to handle high pressures, flexibility, and ease of installation. Additionally, they were supplied in long coils of 100, 200, and 300 meters, which significantly reduced the number of required connections.

The fitting system used included electrofusion couplings, flared ends, and loose flanges, ensuring secure and quick connections. Pexgol’s technical support covered the entire process, from design to on-site installation, including training and tools to optimize the project’s execution.

Ambatovy evaluated alternative solutions such as steel flexible pipes with PE coatings but ruled them out due to long delivery times and the need for specialized installation tools. Pexgol proved to be the most efficient and viable solution, providing a fast, tailored response to the client’s needs.

Pexgol’s performance in this project highlights its ability to overcome technical and logistical challenges in demanding conditions.

Casos de Estudio Relacionados

Instalación de 1000 Metros de Tubería PE-X para una Mina Subterránea.

Líneas de Desagüe Minero

Lundin Mining – Mina Alcaparosa
Chile

 | 

2019
Transporte de Agua con Sólidos desde el Rajo Abierto a la Mina

Desagüe en Mina de Rajo Abierto

Doña Inés de Collahuasi SCM, Mina Collahuasi
Chile

 | 

2013
Inyección de Lechada de Cemento a una Mina Subterránea

Transporte de Lechada de Cemento

Mina Aguilar
Argentina

 | 

2015
Pexgol vs HDPE: Comparación de Transporte de Comida para Peces

Transporte de Alimento Pexgol vs HDPE

Marine Farms
Chile

 | 

2017
Instalación de Tuberías Colgantes Pexgol en Mina Subterránea

Drenaje de agua de mina subterránea

Codelco Chuquicamata
Chile

 | 

2017
Descubre cómo el reemplazo de tuberías con Pexgol resolvió los problemas de corrosión en el sistema de entrega de agua salada de la Piscina Gordon, asegurando su funcionamiento eficiente.

De Acero a Pexgol: Una mejora para la Piscina Gordon de Tel Aviv

Gordon Pool
Israel

 | 

2023