Skip to content

Leached Slurry Transportation

Slurry transportation with high nickel levels

Estudo de Caso Nº

18

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2013

Condições de Trabalho

Extreme transport temperature (110°C).

Solução Pexgol

Pexgol 500 mm, Class 15 & Pexgol 355 mm, Class 15.

Aplicação

Slurry transportation.

Comprimento

350 m.

Categorias

Slurry transportation with high nickel levels

The Challenge

Moa Nickel used to transport leached slurry from the tubular reactors to the CCD thickener feed line. This process caused several issues on different pipe materials. The transported fluid was composed by:

  • 28-32 g/l acid
  • 1,00 g/l N
  • 0,54 g/l Co
  • 1,00 g/l Fe
  • 21,00 g/l SO4
  • 30,0 g/l free acids
  • Solids: 0,086% Ni, 0,013% Co, 46,00% Fe

Previously, titanium Sch20 pipes were installed, but if suffered deformations and it needed to be repaired constantly. The titanium pipe was replaced for a stainless steel pipe 316 Sch40, and it lasted 8 years and it finally required to be replaced because it presented wear issues.

Pexgol Solution

Golan provided 11.8 meters of pipes sections with mechanical joins that could resist corrosion, high temperatures and wear with no effort.

Regarding the prices per meter, installation costs and maintenance, versus stainless steel and titanium pipes, Pexgol proved to be the most convenient option.

Estudos de Caso Relacionados

Transport of acid water at high temperatures

Water Transport with Low pH Level

Moa Nickel S.A. Sherritt
Cuba

 | 

2010
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Comparison of brine transport

Albemarle Salar
Chile

 | 

2020
Enhanced hydraulic and structural reliability for critical community infrastructure.

Optimization of Potable Water Supply for 1,600 residents

Rincón de la Candelaria
Mexico

 | 

2025
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020