Water Drainage at an Underground Mine
Water Drainage From the Inside of an Underground Mine
Estudo de Caso Nº
31
Cliente
El Peñón Yamana Gold, Meridian Mine
Chile
|
2016
Condições de Trabalho
Extreme temperatures (-5° to 38°C).
Solução Pexgol
Pexgol 160 mm Class 15 (SDR 11).
Aplicação
Water drainage.
Comprimento
600 m.
Categorias

The Challenge
The water drainage from the inside of Meridian underground mine was processed through an HDPE 12 meter pipe that required 50 joints to be installed. The total installation time was 4 days, with no chance to minimize costs. Furthermore, the pump operated over it efficiency levels.
Pexgol Solution
A 600 meters Pexgol pipe 160 mm Class 15 was provided, in one section without joints. The Pexgol pipe was carried for 6 kilometers in 2 turns, which caused as a result 50% of time saved in the installation.
Due to the lower load losses, now the pump operates at its mayor efficiency level.
Estudos de Caso Relacionados
Mine Dewatering – High Pressure Conditions
Antofagasta Minerals, Michilla Mine
Chile
|
2011
Pexgol’s Solution for CFE: A Leap in Durability and Efficiency
Comisión Federal de Electricidad
Mexico
|
2023
Comprehensive Redesign of the PumpingSystem with Pexgol at the Sossego Mine
Vale
Brazil
|
2024
Potable Water Aqueduct
Acueducto y Alcantarillado de Bogotá
Colombia
|
2019
Fish Oil Transport at 36°C / 96.8°F
Guaymas Protein Company
Mexico
|
2018