Skip to content

Pulp & Paper Mill

Hot Caustic Line Replacement in Paper Mill

Estudo de Caso Nº

51

Cliente

Svetlogorskiy Mill
Russia

|

2015

Condições de Trabalho

Non-pressure, high temperature and scrubber water

Solução Pexgol

Pexgol 160 mm Class 15

Aplicação

Alkali transportation in caustic and regeneration workshop

Comprimento

13 m

Categorias

Hot Caustic Line Replacement In Paper Mill

The Challenge

At Svetlogorskiy Mill Paper Plant they needed to repair their stainless steel pipes a few times a year, since they were transporting alkali at very high temperature.
The main challenge for the line was the sedimentation issues.

Pexgol Solution

The client decided to replace the stainless steel pipes with Pexgol pipes. Thanks to it smooth inner surface, sedimentation is not a problem and as a consequence requires less maintenance.
The line has been installed since 2015 and it stills shows amazing results.

Estudos de Caso Relacionados

How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Mining Effluent Transportation in Cuba.

Pexgol Optimizes Tailings Management at Sherritt’s Moa Nickel Mine

Sherritt
Cuba

 | 

2020
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Water line feed from wells to mine

Mine Dewatering – High Pressure Conditions

Antofagasta Minerals, Michilla Mine
Chile

 | 

2011
Transport of Drinking Water in Harsh Terrain.

Potable Water Aqueduct

Acueducto y Alcantarillado de Bogotá
Colombia

 | 

2019
Water Transportation through Shafts

Open Cast Mine Dewatering

Agnico Eagle Pinos Altos Mine
Mexico

 | 

2017