Transport of Cyanide Water

Pexgol Pipe Installation for the Transport of Cyanide Water.

Estudo de Caso Nº

112

Cliente

Equinox Gold
Mexico

|

2022

Condições de Trabalho

Fluid: Neutralized Solution pH 10-12 – cyanide water | Flow: 1000m3/hr | Suction level: 1352 m3/hr | Discharge level: 1431/1432 m3/hr

Solução Pexgol

Pexgol 400 mm (16”), class 10 & 15

Aplicação

Transport of cyanide water

Comprimento

1475 m / 4839 ft

Categorias

Pexgol Pipe Installation for the Transport of Cyanide Water.

The Challenge

Equinox Gold, a Canadian mining company dedicated to gold extraction in different countries, required for its “Los Filos” mining unit to pump from the ADR plant a neutralized solution (cyaninated water) for evaporation through sprinklers. Previously, steel and HDPE pipes were used for this type of application.

The steel suffered from corrosion problems and the HDPE from crystallization, which generated problems in the thermofusions.

Pexgol Solution

It was decided to use Pexgol in sections of 12 meters with electrofusion connections. This way, possible corrosion problems were avoided and the costs of the project were reduced.

The installation was carried out by the same personnel working at the mine with training from the Pexgol technical team.

Estudos de Caso Relacionados

Bridging the Gap between Durability and Functionality in Harsh Processing Environments.

Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport

Syncrude
Canada

 | 

2022
Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 

2018
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015