Tailing Lines

Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

Estudo de Caso Nº

63

Cliente

Ambatovy
Madagascar

|

2017

Condições de Trabalho

Pressure 800Kpa Slurry concentration of 35% solids Temperature 70°C to 80°C Composition (NH4) 2SO4 PH 6-8. Flow 3,200 m³/h (2.3 m/s)

Solução Pexgol

Pexgol 630 mm, Class 15

Aplicação

Slurry transportation

Comprimento

720 m

Categorias

Replacement of Carbon Steel Pipes by Pexgol Pipes for Tailing Lines.

The Challenge

Ambatovy for it nickel mine has 15 km of tailing lines. The tailing distribution lines are made of DN700 carbon steel and this pipelines suffered from repetitive and frequent failures.
This failures were because of the effect of erosion, mainly due to the high liquid velocities inside the pipeline, especially in those areas where there is slack flow in the line.
To a lesser extent, further thinning of the pipeline wall occurs, due the presence of the highly corrosive ammonium sulphate salt (NH4)2SO4 . The frequent failures prompted the decision to replace the the carbon steel tailing pipeline with Pexgol pipes.

Pexgol Solution

After designing the lines in cooperation with Paterson & Cook, Ambatovy decided to install Pexgol 630 mm pipes on 2017.

The pipes were installed down hill from the pumping station where velocities are high. Testing the wall thickness periodically showed minimum effect of wear on the installed Pexgol pipes.

Another advantage that Ambatovy pointed out as a reason to use Pexgol systems is the simplicity of dismantling and reinstalling Pexgol pipes when raising the dam’s level, which saves time and money if comparing this to doing it with carbon steel pipes or carboon steel lined pipes.

Estudos de Caso Relacionados

In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Comparison of brine transport

Albemarle Salar
Chile

 | 

2020
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Pexgol Transforms Tailings Transportation at Minera San Julián.

Minera San Julián Adopts Pexgol to Improve Water Management

Fresnillo plc
Mexico

 | 

2024
Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023